NR NR/L3/ELP/29987/MOD X ISSUE 4 PDF

NR NR/L3/ELP/29987/MOD X ISSUE 4 PDF

Name:
NR NR/L3/ELP/29987/MOD X ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable only to areas that are required to adopt a process for securing points of disconnection to form points of isolation (a SIP process) and all future sections of electrification of Network Rail infrastructure.

The requirements of this module are applicable to Network Rail personnel and to Network Rail’s contractors.

This module does not include requirement for the following:

• Work on or about Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system (Sunderland Metro System Operating Area –Module Z). 

Purpose

This module defines the requirements for securing points of disconnection, creating points of isolation, when implementing an Earthed Isolation. 

This module combines relevant local Supplementary Isolation Processes (SIP) that have been implemented into one process and provides a consistent securing process for all future applications. 

The requirements include the specific rules and procedures to be followed so that a sufficient documented safe system of work is prepared and implemented that complies with the Electricity at Work Regulations 1989, specifically Regulation 12.


Edition : 4
File Size : 1 file , 890 KB
Number of Pages : 16
Published : 06/04/2022

History

NR NR/L3/ELP/29987/MOD X ISSUE 5
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/ELP/29987/MOD X ISSUE 4
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/ELP/29987/MOD X ISSUE 3
Published Date: 09/04/2021
Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/ELP/29987/MOD X ISSUE 2
Published Date: 12/01/2018
Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$24.3

Related products

NR NR/CIV/SD/FORM1/4400 ISSUE 3
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Form 001
$13.2
NR NR/L2/TRK/001/MOD03 ISSUE 8
Published Date: 09/03/2016
Inspection and Maintenance of Permanent Way: Plain Line Track
$13.2
NR NR/L2/SIG/30035 ISSUE 5
Published Date: 09/04/2021
Signalling and Level Crossing Scheme Approval Process
$18.6
NR NR/L3/SCO/311/13 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Facilities, Planning and Supervision
$13.2

Best-Selling Products