NR NR/L3/ELP/29987/MOD Y ISSUE 2 PDF

NR NR/L3/ELP/29987/MOD Y ISSUE 2 PDF

Name:
NR NR/L3/ELP/29987/MOD Y ISSUE 2 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to those parts of Network Rail Infrastructure Limited (known as Network Rail) controlled infrastructure equipped with the 750V d.c. overhead line system.

This module applies to Network Rail personnel and Network Rail’s contractors and contains mandatory statements applicable to other persons.

To provide a consistent approach to working on or about 750V d.c. Electrified Lines, Train Operating Companies may, as best practice, apply this module on infrastructure they control.

The module does not include requirement for the following:

• Planning of isolations, testing and earthing of overhead line equipment are to be implemented in areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure.

• Work on or about Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system

Purpose

This module sets out the actions to be taken to avoid danger from the presence of d.c. overhead electrified lines.

The requirements of 25kV a.c. Electrified Lines as defined in this standard apply to the Tram Trains d.c. overhead line, except where indicated in this module.

 


Edition : 2
File Size : 1 file , 580 KB
Number of Pages : 20
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD Y ISSUE 4
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD Y ISSUE 3
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD Y ISSUE 2
Published Date: 12/01/2018
Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD Y ISSUE 1
Published Date: 04/20/2018
Isolation and Earthing of Sheffield Tram Train d.c. Overhead Electrified Lines
$18.6

Related products

NR BRS-SM 625 ISSUE D
Published Date: 08/06/1996
Concrete Bearer Layouts Packing Plate for Soleplate
$5.7
NR NR/CIV/SD/1516 ISSUE F
Published Date: 09/02/2017
E-Type Underbridges: Steelwork General Assembly - 25 to 50 Degrees Composite Floor
$5.7
NR NR/CS/TEL/30101 ISSUE 1
Published Date: 02/01/2006
Telecoms Assurance and Compliance
$13.2
NR NR/CIV/SD/1725 ISSUE C
Published Date: 12/01/2018
Concrete Underbridges: Details: Pre-Cast Off Site Exposed Bottom Flanges Filler Beam Deck
$5.7

Best-Selling Products