NR NR/L3/ELP/29987/MOD Y ISSUE 3 PDF

NR NR/L3/ELP/29987/MOD Y ISSUE 3 PDF

Name:
NR NR/L3/ELP/29987/MOD Y ISSUE 3 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to those parts of Network Rail Infrastructure Limited (known as Network Rail) controlled infrastructure equipped with the 750V d.c. overhead line system.

This module applies to Network Rail personnel and Network Rail’s contractors and contains mandatory statements applicable to other persons.

To provide a consistent approach to working on or about 750V d.c. Electrified Lines, Train Operating Companies may, as best practice, apply this module on infrastructure they control.

The module does not include requirement for the following:

• Work on or about Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system

Purpose

This module sets out the actions to be taken to avoid danger from the presence of d.c. overhead electrified lines. 

The requirements of 25kV a.c. Electrified Lines as defined in this standard apply to the Tram Trains d.c. overhead line, except where indicated in this module.


Edition : 3
File Size : 1 file , 330 KB
Number of Pages : 19
Published : 06/04/2022

History

NR NR/L3/ELP/29987/MOD Y ISSUE 4
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD Y ISSUE 3
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD Y ISSUE 2
Published Date: 12/01/2018
Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD Y ISSUE 1
Published Date: 04/20/2018
Isolation and Earthing of Sheffield Tram Train d.c. Overhead Electrified Lines
$18.6

Related products

NR NR/L3/MTC/RCS0216/MAT01 ISSUE 2
Published Date: 06/05/2021
Risk Control Manual: Unloading Ballast from Sidetipper or Autoballaster
$5.7
NR BRS-SC 20 ISSUE B
Published Date: 06/09/1975
Cable Trough - Concrete Tee Junction Segments for 190mm Wide 130mm Deep & 250mm Wide 130mm Deep Internally - Troughs
$5.7
NR E10000/83/16 ISSUE B
Published Date: 10/01/1980
A.W.S. Inductors - Position of Inductors in Relation to Associated Signal
$5.7
NR NR/L2/ADG/002/08 ISSUE 1
Published Date: 12/03/2016
Asset Data Governance Framework Manual: Data Quality Measurement
$7.5

Best-Selling Products

Operation of Small Wastewater Systems
Published Date: 08/01/1997
$11.7
Small Water Systems Operation & Maintenance
Published Date: 02/01/1999
$7.8
Water Treatment Plant Operation, Volume 1
Published Date: 07/01/1999
$11.7