NR NR/L3/ELP/29987/MOD01 ISSUE 8 PDF

NR NR/L3/ELP/29987/MOD01 ISSUE 8 PDF

Name:
NR NR/L3/ELP/29987/MOD01 ISSUE 8 PDF

Published Date:
09/03/2022

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: General Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the general requirements for working on or about 25 kV a.c. electrified lines including responsibilities, a description of the electrification systems, the danger that can arise from live overhead line equipment and how to communicate with the Electrical Control Operator (ECO).

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation a Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module supports a consistent understanding of 25 kV a.c. electrification and working on or about 25 kV a.c. electrified lines.

NOTE: Further requirements for working on or about the electrified lines and for communication are contained in the Rule Book Modules AC, HB16 and G1 (GE/RT8000/AC, GE/RT8000/HB16 and GE/RT8000/G1).


Edition : 8
File Size : 1 file , 230 KB
Number of Pages : 14
Published : 09/03/2022

History

NR NR/L3/ELP/29987/MOD01 ISSUE 9
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: General Requirements
$24.3

Related products

NR NR/L3/OCS/043/4.4 ISSUE 1
Published Date: 03/01/2008
National Control Instructions: Connection Policy
$5.7
NR SMF/EP/0245 ISSUE 10
Published Date: 10/01/2010
Work On or Adjacent to Conductor Rail: Risk Level Ratings for Ellipse Standard Jobs
$5.7
NR NR/L3/CIV/151/F010 ISSUE 17
Published Date: 03/06/2021
Index of Standard Designs and Details for Building and Civil Engineering Works
$18.6
NR TWI 2C025 ISSUE 1
Published Date: 03/01/2005
How to Change a Check Block Bolt
$5.7

Best-Selling Products

13281 1.00040
Published Date: 09/01/1997
Fundamentals of Petroleum
$10.5