NR NR/L3/ELP/29987/MOD01 ISSUE 7 PDF

NR NR/L3/ELP/29987/MOD01 ISSUE 7 PDF

Name:
NR NR/L3/ELP/29987/MOD01 ISSUE 7 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: General Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the general requirements for working on or about 25 kV a.c. electrified lines including responsibilities, a description of the electrification systems, the danger that can arise from live overhead line equipment and how to communicate with the Electrical Control Operator (ECO).

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation a Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module supports a consistent understanding of 25 kV a.c. electrification and working on or about 25 kV a.c. electrified lines. 

NOTE: Further requirements for working on or about the electrified lines and for communication are contained in the Rule Book Modules AC, HB16 and G1 (GE/RT8000/AC, GE/RT8000/HB16 and GE/RT8000/G1). 


Edition : 7
File Size : 1 file , 210 KB
Number of Pages : 14
Published : 06/04/2022

History

NR NR/L3/ELP/29987/MOD01 ISSUE 9
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: General Requirements
$24.3

Related products

NR NR/L2/TEL/30109 ISSUE 2
Published Date: 06/05/2010
Maintenance of Plasma Displays (SISS)
$7.5
NR BRS-SM 2203/3 ISSUE A
Published Date: 05/28/1992
Rail Clamp Point Lock Special Bolt
$5.7
NR SAO-IEC-HP-15 ISSUE 5
Published Date: 10/29/1999
Integrated Electronic Control Centre Project Handbook IECC 8005 Timescale Planning
$18.6
NR BRS-SM 523/1 ISSUE C
Published Date: 10/07/1991
Rail Clamp Point Lock Centre Thrust Bracket Type 'A'
$5.7

Best-Selling Products