NR NR/L3/ELP/29987/MOD04 ISSUE 6 PDF

NR NR/L3/ELP/29987/MOD04 ISSUE 6 PDF

Name:
NR NR/L3/ELP/29987/MOD04 ISSUE 6 PDF

Published Date:
09/04/2021

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements for maintaining the integrity and safe and efficient operation of the 25 kV a.c. electrification system, through attention to the position of the

overhead line equipment relative to the track, to traction bonding, and to automatic power control inductors.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

•    Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled

infrastructure equipped with the 1500V d.c. overhead line system.

•    Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

•    Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

Purpose

Compliance with this module will preserve the integrity ofthe 25 kV a.c. electrification system and promote its safe and efficient operation through requirements and controls for its physical condition, electrical continuity and relationship with other infrastructure systems.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).


Edition : 6
File Size : 1 file , 260 KB
Number of Pages : 12
Published : 09/04/2021

History

NR NR/L3/ELP/29987/MOD04 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD04 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD04 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD04 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
$24.3

Related products

NR NR/L3/CIV/194 ISSUE 2
Published Date: 12/03/2022
Selection and Design of New and Upgraded Lifts
$24.3
NR RT/D/S/006 ISSUE 1
Published Date: 03/01/1996
Retro-Reflective Temporary Speed Equipment (aka NR/SP/SIG/006)
$13.2
NR RT/ETE/3/5/1
Published Date: 03/17/1998
Arrangement of Track Cables in Concrete Troughing
$5.7
NR NR/L3/CIV/140/120N ISSUE 3
Published Date: 06/01/2008
Model Clause 120N: General Requirements for Bridge Installation Methods & Temporary Works
$5.7

Best-Selling Products