NR NR/L3/ELP/29987/MOD05 ISSUE 5 PDF

NR NR/L3/ELP/29987/MOD05 ISSUE 5 PDF

Name:
NR NR/L3/ELP/29987/MOD05 ISSUE 5 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Working On or About 25 kV A.C. Electrified Lines: Particular Actions to be Taken by the Infrastructure Maintainer

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements for particular actions to be taken by the Infrastructure Maintainer on or about 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

Purpose

Compliance with this module will preserve the integrity of the 25 kV a.c. electrification system and promote its safe operation through requirements for actions by the Infrastructure Maintainer.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)).


Edition : 5
File Size : 1 file , 220 KB
Number of Pages : 9
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD05 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Particular Actions to Be Taken by the Infrastructure Maintainer
$7.5
NR NR/L3/ELP/29987/MOD05 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Particular Actions to be Taken by the Infrastructure Maintainer
$7.5
NR NR/L3/ELP/29987/MOD05 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Particular Actions to be Taken by the Infrastructure Maintainer
$7.5

Related products

NR NR/CIV/SD/1714 ISSUE D
Published Date: 12/01/2018
Concrete Underbridges: General Arrangements: Cast on Site Exposed Bottom Flange Filler Beam Deck
$5.7
NR RT/E/WI/27105 ISSUE 1
Published Date: 12/04/2004
Isolation & Earthing at York Way TSC (aka NR/WI/ELP/27105)
$18.6
NR NR/CIV/SD/4504
Published Date: 03/05/2021
Frame Open Footbridge Series 4500: Diversity Impact Assessment
$5.7
NR RT/ETE/7/A/1
Published Date: 03/17/1998
General Arrangement of Single & Double Protective Timber Boarding
$5.7

Best-Selling Products