NR NR/L3/ELP/29987/MOD05 ISSUE 6 PDF

NR NR/L3/ELP/29987/MOD05 ISSUE 6 PDF

Name:
NR NR/L3/ELP/29987/MOD05 ISSUE 6 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Particular Actions to be Taken by the Infrastructure Maintainer

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements for particular actions to be taken by the Infrastructure Maintainer on or about 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z)

Purpose

Compliance with this module will preserve the integrity of the 25 kV a.c. electrification system and promote its safe operation through requirements for actions by the Infrastructure Maintainer. 

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)).


Edition : 6
File Size : 1 file , 160 KB
Number of Pages : 9
Published : 06/04/2022

History

NR NR/L3/ELP/29987/MOD05 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Particular Actions to Be Taken by the Infrastructure Maintainer
$7.5
NR NR/L3/ELP/29987/MOD05 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Particular Actions to be Taken by the Infrastructure Maintainer
$7.5
NR NR/L3/ELP/29987/MOD05 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Particular Actions to be Taken by the Infrastructure Maintainer
$7.5

Related products

NR BRS-SE 181/5
Published Date: 10/07/2000
Flashing Warning Road Lights Red Light Camera Interface Enclosure Bracket
$5.7
NR E10018/10 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Former Western Region Point Circuits WZR - Self Restored Points
$5.7
NR RT/E/S/40026 ISSUE 1
Published Date: 02/01/1996
Core Maintenance Specification for Sewage Disposal Plant
$13.2
NR NR/L2/ELP/27311 ISSUE 6
Published Date: 09/05/2020
Engineering Assurance Requirements for Design and Implementation of Electrical Power
$18.6

Best-Selling Products