NR NR/L3/ELP/29987/MOD08 ISSUE 5 PDF

NR NR/L3/ELP/29987/MOD08 ISSUE 5 PDF

Name:
NR NR/L3/ELP/29987/MOD08 ISSUE 5 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Working On or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements for the isolation and earthing of overhead line equipment where local isolations are specified in the isolation instructions.

It is applicable to Network Rail personnel and to Network Rail’s contractors. It is also applicable in relevant part to Train Operating Companies having locally controlled 25 kV a.c. overhead lines which abut those controlled by Network Rail.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

Purpose

Compliance with this module will promote safe operation of the 25 kV a.c. electrification system and produce consistent implementation of secure isolation procedures at locally controlled sidings and depots.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).


Edition : 5
File Size : 1 file , 190 KB
Number of Pages : 6
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD08 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
$7.5
NR NR/L3/ELP/29987/MOD08 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
$7.5
NR NR/L3/ELP/29987/MOD08 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
$7.5
NR NR/L3/ELP/29987/MOD08 ISSUE 4
Published Date: 09/05/2015
Working On or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
$7.5

Related products

NR TWI 2L008 ISSUE 1
Published Date: 03/01/2017
How to Inspect Class III Boundary Measures
$13.2
NR NB 073 ISSUE 2
Published Date: 02/01/2009
Retro-Reflective Materials - change of classification
$5.7
NR BRS-ST 97/4
Published Date:
Cover Terminal Box Signal Road Warning Flashing Light Unit Lifting Barrier (Auto MK II B)
$5.7
NR T25311 ISSUE 2
Published Date: 06/02/2018
Lineside and On Track Equipment Typical Circuits - Point Machine - Double End, Location Internal Circuits, WJR in Location
$5.7

Best-Selling Products

Designing Web Usability
Published Date: 12/20/1999
$13.5
Switched, Fast, and Gigabit Ethernet
Published Date: 12/30/1998
$15