NR NR/L3/ELP/29987/MOD08 ISSUE 6 PDF

NR NR/L3/ELP/29987/MOD08 ISSUE 6 PDF

Name:
NR NR/L3/ELP/29987/MOD08 ISSUE 6 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements for the isolation and earthing of overhead line equipment where local isolations are specified in the isolation instructions.

It is applicable to Network Rail personnel and to Network Rail’s contractors. It is also applicable in relevant part to Train Operating Companies having locally controlled 25 kV a.c. overhead lines which abut those controlled by Network Rail.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

Compliance with this module will promote safe operation of the 25 kV a.c. electrification system and produce consistent implementation of secure isolation procedures at locally controlled sidings and depots.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).


Edition : 6
File Size : 1 file , 140 KB
Number of Pages : 6
Published : 06/04/2022

History

NR NR/L3/ELP/29987/MOD08 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
$7.5
NR NR/L3/ELP/29987/MOD08 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
$7.5
NR NR/L3/ELP/29987/MOD08 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
$7.5
NR NR/L3/ELP/29987/MOD08 ISSUE 4
Published Date: 09/05/2015
Working On or About 25 kV A.C. Electrified Lines: Local Isolation and Earthing of Overhead Line Equipment
$7.5

Related products

NR NR/L3/MTC/RCS0216/TK61 ISSUE 5
Published Date: 09/04/2021
Risk Control Manual: Alumino Thermic Welding
$5.7
NR NR/L2/CTM/201 ISSUE 2
Published Date: 03/03/2012
Competence Management
$18.6
NR NR/CIV/SD/2508 ISSUE A
Published Date: 03/05/2011
Modular Overbridge Design Shear Stud Layout & Weld Details Sheet 1 of 2
$5.7
NR NR/L2/TRK/0032 ISSUE 7
Published Date: 03/03/2018
Joining of Rails by Aluminothermic Welding
$18.6

Best-Selling Products

NYBC NYBC
Published Date: 05/01/2002
New York Building Code
$19.8
NYBC NYBC
Published Date: 08/01/2010
Building Code of New York State
$33.3
NYBC NYBC
Published Date: 08/01/2007
New York Building Code
$30.6
NYBC NYBC
Published Date: 11/01/2019
2020 Building Code of New York State
$42.9
NYBC NYCBC
Published Date: 09/01/2022
2022 New York City Building Code
$53.1
NYBC NYCFC
Published Date: 10/01/2022
2022 New York City Fire Code
$37.2