NR NR/L3/ELP/29987/MOD09 ISSUE 7 PDF

NR NR/L3/ELP/29987/MOD09 ISSUE 7 PDF

Name:
NR NR/L3/ELP/29987/MOD09 ISSUE 7 PDF

Published Date:
09/03/2022

Status:
[ Active ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This module states the requirements for constructing overhead line equipment, working on new overhead line equipment and dismantling existing overhead line equipment.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach for dealing with new overhead line equipment, overhead line equipment under construction and redundant existing overhead line equipment being dismantled so that the general requirements for working on or about 25 kV a.c. electrified lines are not prejudiced.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)).


Edition : 7
File Size : 1 file , 130 KB
Number of Pages : 5
Published : 09/03/2022

History

NR NR/L3/ELP/29987/MOD09 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment
$5.7
NR NR/L3/ELP/29987/MOD09 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment
$5.7
NR NR/L3/ELP/29987/MOD09 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment
$5.7

Related products

NR NR/L3/ELP/27241 ISSUE 7
Published Date: 03/02/2024
Fixed Plant Work Instructions
$7.5
NR NB 015 ISSUE 1
Published Date: 03/01/2004
Route Indicators Erroneously Remaining Off
$5.7
NR NR/CIV/SD/1074 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Single Track 2 Girders & Double Track 3 Girders: Inspection Units Sheet 2 of 2
$5.7
NR TWI 3G129 ISSUE 1
Published Date: 08/01/2013
How to Scope and Install a Head Repair Weld (HRW)
$13.2

Best-Selling Products