NR NR/L3/ELP/29987/MOD09 ISSUE 5 PDF

NR NR/L3/ELP/29987/MOD09 ISSUE 5 PDF

Name:
NR NR/L3/ELP/29987/MOD09 ISSUE 5 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Working On or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This module states the requirements for constructing overhead line equipment, working on new overhead line equipment and dismantling existing overhead line equipment.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

Purpose

This module provides a consistent approach for dealing with new overhead line equipment, overhead line equipment under construction and redundant existing overhead line equipment being dismantled so that the general requirements for working on or about 25 kV a.c. electrified lines are not prejudiced.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)).


Edition : 5
File Size : 1 file , 180 KB
Number of Pages : 5
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD09 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment
$5.7
NR NR/L3/ELP/29987/MOD09 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment
$5.7
NR NR/L3/ELP/29987/MOD09 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment
$5.7

Related products

NR E10000/94/18 ISSUE A
Published Date: 12/03/1992
Power Supply - 240V Ups System Power Cubicle Wiring (2)
$5.7
NR NR/L2/OTK/5100/MOD01 ISSUE 5
Published Date: 09/03/2022
Boundary Measure Management Manual: Boundary Measure Inspection and Evaluation
$18.6
NR NR/CIV/SD/1501 ISSUE D
Published Date: 09/02/2017
E-Type Underbridges: Key to Types - Filler Beam Floor
$5.7
NR NR/CIV/SD/1712 ISSUE C
Published Date: 09/02/2017
Concrete Underbridges: General Arrangements: Cast on Site Fully Encased Filler Beam Deck
$5.7

Best-Selling Products

Software Engineering Classics
Published Date: 11/01/1998