NR NR/L3/ELP/29987/MOD11 ISSUE 6 PDF

NR NR/L3/ELP/29987/MOD11 ISSUE 6 PDF

Name:
NR NR/L3/ELP/29987/MOD11 ISSUE 6 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-elp-29987-mod11-issue-6_2761444

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This module states the requirements to be met when working on the overhead line equipment on 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach to working on the overhead line equipment of 25 kV a.c. electrified lines. 

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).


Edition : 6
File Size : 1 file , 250 KB
Number of Pages : 15
Published : 06/04/2022

History

NR NR/L3/ELP/29987/MOD11 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment
13.20 €
NR NR/L3/ELP/29987/MOD11 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment
13.20 €
NR NR/L3/ELP/29987/MOD11 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment
13.20 €

Related products

NR NR/L3/ELP/27240/NR/DIST C03D ISSUE 6
Published Date: 06/03/2023
Maintenance of VCB Switchgear
13.20 €
NR NR/L3/OCS/043/2.8 ISSUE 2
Published Date: 03/01/2010
National Control Instructions: Evacuation of Signalling/Control Locations
5.70 €
NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 2
Published Date: 09/05/2020
Isolation and Earthing of Autotransformer Feeder Cables Installed as Part of the -25 - 0 - +25kV Autotransformer System between Welwyn B ATFS and Hitchin SATS
5.70 €
NR X20250 ISSUE 1
Published Date: 02/05/2000
ABCL TYPICAL CIRCUITS RELAY CONFIGURATION DETAILS
5.70 €

Best-Selling Products

AIA AIA NAS SET
Published Date: 04/01/2023
COMPLETE HARDCOPY SET OF AEROSPACE INDUSTRIES ASSOCIATION (AIA) NATIONAL AEROSPACE STANDARDS - INCLUDES ALL CURRENT & INACTIVE FORNEW DESIGN NAS, NASM, NA & METRIC NAS STANDARDS* * 12 VOLUME SET ADD ON 12" GLOBAL BINDER 3" WHITE & (1) GLOBAL BINDER 1" WHITE
AIA ARTC-4
Published Date: 07/01/1960
[BEST AVAILABLE COPY] Electrical Test Procedures for Radomes and Radome Materials
20.70 €
AIA NA0001-0006
Published Date: 03/31/2011
RIVET, SOLID, UNIVERSAL HEAD, ALUMINUM AND ALUMINUM ALLOY, METRIC
19.80 €
AIA NA0001-0006
Published Date: 01/01/1978
Rivet, Solid - Universal Head Aluminum and Aluminum Alloy, Metric
19.80 €
AIA NA0001-0006
Published Date: 12/19/2014
RIVET, SOLID, UNIVERSAL HEAD, ALUMINUM AND ALUMINUM ALLOY, METRIC
16.50 €
AIA NA0001-0006
Published Date: 12/19/2014
RIVET, SOLID, UNIVERSAL HEAD, ALUMINUM AND ALUMINUM ALLOY, METRIC
19.80 €