NR NR/L3/ELP/29987/MOD11 ISSUE 7 PDF

NR NR/L3/ELP/29987/MOD11 ISSUE 7 PDF

Name:
NR NR/L3/ELP/29987/MOD11 ISSUE 7 PDF

Published Date:
09/03/2022

Status:
[ Active ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements to be met when working on the overhead line equipment on 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach to working on the overhead line equipment of 25 kV a.c. electrified lines.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).


Edition : 7
File Size : 1 file , 250 KB
Number of Pages : 15
Published : 09/03/2022

History

NR NR/L3/ELP/29987/MOD11 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment
$13.2
NR NR/L3/ELP/29987/MOD11 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment
$13.2
NR NR/L3/ELP/29987/MOD11 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment
$13.2

Related products

NR BRS-SM 2204 ISSUE H
Published Date: 04/07/1998
Rail Clamp Point Lock Mk 2 Switchplate Assembly
$5.7
NR X22030 ISSUE 1
Published Date: 02/04/1995
ABCL STANDARDS FREDDY TREADLES A, B, C, D
$5.7
NR NR/L2/TEL/30036 ISSUE 4
Published Date: 08/26/2008
Booster Transformer Outages: Managing the Consequences for Telecommunication Systems
$13.2
NR TI 118 ISSUE 1
Published Date: 11/01/2008
NR/SMS and NR/SMTH items for the Siemens AzS 350U Axle Counter System
$18.6

Best-Selling Products

Almeria
Published Date: 01/01/2015
$15
Auvergne
Published Date: 01/01/2001
$10.5
Breakthroughs in Geology
Published Date: 01/01/2019
$10.5
Canary Islands
Published Date: 01/01/2002
$11.4