NR NR/L3/ELP/29987/MOD12 ISSUE 5 PDF

NR NR/L3/ELP/29987/MOD12 ISSUE 5 PDF

Name:
NR NR/L3/ELP/29987/MOD12 ISSUE 5 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Working On or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements for the management of local isolation instructions for the isolation and earthing of overhead line equipment where local isolation is allowed, in accordance with Module 8, on 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

It is also applicable to Train Operating Companies having locally controlled 25 kV a.c. overhead lines which abut those controlled by Network Rail.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard on all infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

Purpose

This module provide a consistent approach to the production, approval, distribution and auditing of local isolation instructions on 25 kV a.c. electrified lines.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).

 


Edition : 5
File Size : 1 file , 320 KB
Number of Pages : 18
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD12 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment
$13.2
NR NR/L3/ELP/29987/MOD12 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment
$13.2
NR NR/L3/ELP/29987/MOD12 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment
$13.2

Related products

NR TWI 2P036 ISSUE 2
Published Date: 03/01/2012
How to Change a Plain Wooden Sleeper by Hand
$13.2
NR TI 092 ISSUE 1
Published Date: 05/01/2008
Provision and extent of Comprehensive Approach Locking
$5.7
NR NR/L3/OCS/044/FS-01A ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Planned General Inspections – Initial Survey Form
$5.7
NR T28325 ISSUE 3
Published Date: 04/07/2007
Lineside & On Track Equipment Typical Circuits Signals & Indicators Colour Light, Lighting Circuit, 4 Aspect( Dorman LED) R/Y/YY/G
$5.7

Best-Selling Products