NR NR/L3/ELP/29987/MOD12 ISSUE 7 PDF

NR NR/L3/ELP/29987/MOD12 ISSUE 7 PDF

Name:
NR NR/L3/ELP/29987/MOD12 ISSUE 7 PDF

Published Date:
09/03/2022

Status:
[ Active ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements for the management of local isolation instructions for the isolation and earthing of overhead line equipment where local isolation is allowed, in accordance with Module 8, on 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

It is also applicable to Train Operating Companies having locally controlled 25 kV a.c. overhead lines which abut those controlled by Network Rail.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard on all infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach to the production, approval, distribution and auditing of local isolation instructions on 25 kV a.c. electrified lines.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16). 


Edition : 7
File Size : 1 file , 260 KB
Number of Pages : 19
Published : 09/03/2022

History

NR NR/L3/ELP/29987/MOD12 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment
$13.2
NR NR/L3/ELP/29987/MOD12 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment
$13.2
NR NR/L3/ELP/29987/MOD12 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Management of Local Isolation Instructions for Overhead Line Equipment
$13.2

Related products

NR BRS-SM 2339/1 ISSUE B
Published Date: 01/17/1994
Supplementary Drive Connection Rod Jaw End to 1 1/4" Screwed End with 95 Downset & 50 LH Offset
$5.7
NR BR 822 ISSUE B
Published Date: 06/01/1981
Automatic Revenue Collection Car Parking Control Equipment - Season Tickets
$13.2
NR RT/D/P/085 ISSUE 4
Published Date: 05/01/2004
Management of Track Faults Found by Track Recording Vehicle (aka NR/SP/TRK/085)
$7.5
NR NR/L1/ADG/001 ISSUE 1
Published Date: 12/03/2016
Asset Data Policy
$13.2

Best-Selling Products

2019 IADC Membership Directory
Published Date: 2019
$22.5
2020 IADC Membership Directory
Published Date: 2020
$22.5
2021 IADC Membership Directory
Published Date: 2021
$22.5
2022 IADC Membership Directory
Published Date: 2022
$22.5
2023 IADC Membership Directory
Published Date: 2023
$22.5
2024 IADC Membership Directory
Published Date: 2024
$22.5