NR NR/L3/ELP/SAI25/05 ISSUE 1 PDF

NR NR/L3/ELP/SAI25/05 ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/05 ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Revised ]

Description:

Working On or About Overhead Line Equipment (SAI): Particular Actions to Be Taken by the Infrastructure Maintainer

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements for particular actions to be taken by the Infrastructure Maintainer on or about Overhead Line Equipment.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z). 

Purpose

Compliance with this module will preserve the integrity of the Overhead Line Equipment and promote its safe operation through requirements for actions by the Infrastructure Maintainer.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)). 


Edition : 1
File Size : 2 files , 420 KB
Number of Pages : 9
Published : 06/03/2023

History

NR NR/L3/ELP/SAI25/05 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): Particular Actions to Be Taken by the Infrastructure Maintainer
$7.5
NR NR/L3/ELP/SAI25/05 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI): Particular Actions to Be Taken by the Infrastructure Maintainer
$7.5

Related products

NR NR/L3/SCO/313/SP-2.01/AC ISSUE 3
Published Date: 06/01/2024
On-Track Machines (OTMs) Driver and Operations Standards Manual: Cab Access: Information to Driving Compartment Visitors
$5.7
NR RT/E/C/11205 ISSUE 1
Published Date: 08/01/2000
Symbols for Signalling Circuit Diagrams (aka NR/GN/SIG/11205)
$18.6
NR NR/L3/TRK/002/D15 ISSUE 1
Published Date: 08/01/2007
Access Points - Inspect
$5.7
NR NR/L3/MTC/RCS0216/MP08 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Use of OTP for Excavation
$5.7

Best-Selling Products

DRM ASME B31.3 & GUIDE SET
Published Date: 01/01/2000
ASME PROCESS PIPING / PROCESS PIPING: THE COMPLETE GUIDE TO ASME B31.3 SET (ASME B31.3 & ASME B31.3 GUIDE) - YOU SAVE 10% ***INCLUDES B31.3-2020 EDITION***
$160.5
DRM ASME B31.8 PIPING SET
Published Date: 01/01/2000
ASME GAS TRANSMISSION PIPING SET - INCLUDES ASME B31.8, ASME B31.8S, ASME B31.1, ASME B31.3 AND ASME B31.3 GUIDE - YOU SAVE 10%
$364.5
DRM DEEPWATER SET
Published Date: 01/01/2000
DEEPWATER SET INCLUDES THE FOLLOWING STANDARDS: API RP 14J, API RP 2A-WSD, API RP 2FPS, API RP 2RD, API RP 2SK, API RP 2SM, API RP 2T, API SPEC 17J, AWS D3.6M
$274.5
DRM DRM COMBO
Published Date: 01/01/2008
Drawing Requirements Manual (Hardcopy Bound & DVD)
$157.5
DRM DRM DVD
Published Date: 01/01/2008
Drawing Requirements Manual DVD
$104.7
DRM DRM
Published Date: 01/01/2008
DRAWING REQUIREMENTS MANUAL
$104.7