NR NR/L3/ELP/SAI25/05 ISSUE 2 PDF

NR NR/L3/ELP/SAI25/05 ISSUE 2 PDF

Name:
NR NR/L3/ELP/SAI25/05 ISSUE 2 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

Working On or About Overhead Line Equipment (SAI): Particular Actions to Be Taken by the Infrastructure Maintainer

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements for particular actions to be taken by the Infrastructure Maintainer on or about Overhead Line Equipment.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This module also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X). 

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z). 

Purpose 

Compliance with this module will preserve the integrity of the Overhead Line Equipment and promote its safe operation through requirements for actions by the Infrastructure Maintainer. 

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)). 


Edition : 2
File Size : 1 file , 160 KB
Number of Pages : 9
Published : 12/02/2023

History

NR NR/L3/ELP/SAI25/05 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): Particular Actions to Be Taken by the Infrastructure Maintainer
$7.5
NR NR/L3/ELP/SAI25/05 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI): Particular Actions to Be Taken by the Infrastructure Maintainer
$7.5

Related products

NR NR/L3/OCS/044/FS-39H ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Station Security Plan - Restricted - Vehicle Management Strategy
$5.7
NR NR/PS/SIG/00018 ISSUE 1
Published Date: 10/01/2006
ERSE Mk.4 Product Specification
$13.2
NR NR/L2/SIG/30014/D120/TS7-51 ISSUE 3
Published Date: 12/05/2020
Signalling Works Testing Handbook: Signage Signalling Works Test Specification
$5.7
NR NR/CIV/SD/552 ISSUE E
Published Date: 09/02/2017
Tunnels - Sprayed Concrete Lining Renewal: Upper Haunch Breakout & Replacement
$5.7

Best-Selling Products