NR NR/L3/ELP/SAI25/06 ISSUE 2 PDF

NR NR/L3/ELP/SAI25/06 ISSUE 2 PDF

Name:
NR NR/L3/ELP/SAI25/06 ISSUE 2 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

Working On or About Overhead Line Equipment (SAI): Planning of Earthed Isolations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-elp-sai25-06-issue-2_2764685

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This module states the requirements for the advance planning of earthed isolations for the purpose of carrying out work in order to produce a coherent technically compliant Isolation Planning Form (IPF) for a particular week and route on Overhead Line Equipment.

It is applicable to Network Rail personnel and to Network Rail’s contractors. It is also applicable in relevant part to Train Operating Companies having locally controlled Overhead Line Equipment which abut those controlled by Network Rail.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This module also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach to planning earthed isolations on Overhead Line Equipment and preparing coherent technically compliant Isolation Planning Forms (IPF).

NOTE: The requirements of this module do not alter the requirements of the Rule Book GE/RT8000. Reference should be made to Rule Book module AC (GE/RT8000/AC) and Handbook 16 (GE/RT8000/HB16).


Edition : 2
File Size : 2 files , 1.1 MB
Number of Pages : 26
Published : 12/02/2023

History

NR NR/L3/ELP/SAI25/06 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): Planning of Earthed Isolations
13.20 €
NR NR/L3/ELP/SAI25/06 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI): Planning of Earthed Isolations
13.20 €

Related products

NR BRS-SM 5841/1/20 ISSUE A
Published Date: 01/30/1991
Location Base & Platform for Cuttings Parts List - Type 'B' with Wood Floor
5.70 €
NR NR/CIV/SD/FORMA/500 ISSUE P4
Published Date: 07/13/2011
Form A: Tunnel Shaft Grille and Ring Dam
13.20 €
NR NR/L2/OTK/5100/MOD01 ISSUE 5
Published Date: 09/03/2022
Boundary Measure Management Manual: Boundary Measure Inspection and Evaluation
18.60 €
NR NB 001 ISSUE 1
Published Date: 06/01/2003
Always the 'Fringe'?
5.70 €

Best-Selling Products

BS ISO/PAS 12006-3:2001
Published Date: 01/09/2002
Building construction. Organization of information about construction works-Framework for object-oriented information exchange
92.96 €
BS ISO/PAS 17984:2001
Published Date: 08/15/2001
Machine-made textile floor coverings. Determination of dimensional changes after exposure to heat and/or water
57.15 €