NR NR/L3/ELP/SAI25/10 ISSUE 1 PDF

NR NR/L3/ELP/SAI25/10 ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/10 ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Active ]

Description:

Working On or About Overhead Line Equipment (SAI): Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements when using voltage testing devices, portable earthing equipment and temporary continuity jumpers on Overhead Line Equipment.

The requirements for assembly, maintenance and care of voltage testing devices, portable earthing equipment and temporary continuity jumpers are stated in Network Rail standard NR/L3/ELP/27237.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z). 

Purpose

This module provides a consistent approach to using voltage testing devices, portable earthing equipment and temporary continuity jumpers on Overhead Line Equipment.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)). 


Edition : 1
File Size : 1 file , 160 KB
Number of Pages : 8
Published : 06/03/2023

History


Related products

NR BRS-SE 182/2 ISSUE A
Published Date: 10/07/2000
Flashing Warning Road Lights Cover for Angle Bracket Assy
$5.7
NR TWI 2P009 ISSUE 1
Published Date: 03/01/2005
How to Maintain a Rail Flange Lubricator
$5.7
NR NR/L3/TEL/30082 ISSUE 4
Published Date: 06/03/2017
Work Instruction for the Maintenance of Voice Recorders
$13.2
NR NR/L3/INF/02222 ISSUE 2
Published Date: 03/04/2023
Metadata for Documents and Records
$7.5

Best-Selling Products

BICSI 001-2017 R22
Published Date: 01/01/2017
Information and Communication Technology Systems Design and Implementation Best Practices for Educational Institutions and Facilities
$28.5
BICSI 002-2019
Published Date: 05/01/2019
Data Center Design and Implementation Best Practices
$157.5
BICSI 002-2024
Published Date: 05/01/2024
Data Center Design and Implementation Best Practices
$157.5
BICSI 003-2024
Published Date: 02/29/2024
Building Information Modeling (BIM) Practices for Information Communication Technology Systems
$31.5
BICSI 004-2018
Published Date: 03/01/2018
Information Technology Systems Design and Implementation Best Practices for Healthcare Institutions and Facilities
$64.5
BICSI 006-2020
Published Date: 11/25/2019
Distributed Antenna System (DAS) Design and Implementation Best Practices
$67.5