NR NR/L3/ELP/SAI25/11 ISSUE 1 PDF

NR NR/L3/ELP/SAI25/11 ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/11 ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Revised ]

Description:

Working On or About Overhead Line Equipment (SAI): Working On Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements to be met when working on Overhead Line Equipment.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose 

This module provides a consistent approach to working on Overhead Line Equipment. 

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).


Edition : 1
File Size : 2 files , 640 KB
Number of Pages : 15
Published : 06/03/2023

History

NR NR/L3/ELP/SAI25/11 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): Working On Overhead Line Equipment
$13.2
NR NR/L3/ELP/SAI25/11 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI): Working On Overhead Line Equipment
$13.2

Related products

NR NR/L2/RMVP/0198 ISSUE 2
Published Date: 06/04/2011
Construction & Maintenance of On-Track Plant Access Points (aka NR/L2/RVE/0198 or NR/L2/RMVP/0200/P008)
$18.6
NR TI 079 ISSUE 2
Published Date: 08/26/2008
SMTH Testing Plan - Isolation of TPWS Equipment at Simple PSRs
$5.7
NR NB 041 ISSUE 1
Published Date: 02/01/2005
Signalling Functions Carried in Telecommunications Circuits
$5.7
NR NR/L3/MTC/RCS0216/MAT04 ISSUE 3
Published Date: 12/04/2021
Risk Control Manual: Continuous Welded Rail (CWR) Delivery by Rail Delivery Train (RDT)
$5.7

Best-Selling Products

AVIXA A102.01
Published Date: 04/11/2017
Audio Coverage Uniformity in Listener Areas
$22.5
AVIXA ANSI/INFOCOMM 10
Published Date: 12/20/2013
Audiovisual Systems Performance Verification
$22.5
AVIXA ANSI/INFOCOMM 2M
Published Date: 12/05/2010
Standard Guide for Audiovisual Systems Design and Coordination Processes
$22.5
AVIXA ANSI/INFOCOMM 3M
Published Date: 06/30/2011
Projected Image System Contrast Ratio
$22.5
AVIXA ANSI/INFOCOMM 4
Published Date: 06/19/2012
Audiovisual Systems Energy Management
$22.5
AVIXA F501.01
Published Date: 12/31/2015
Cable Labeling for Audiovisual Systems
$22.5