NR NR/L3/ELP/SAI25/MOD X ISSUE 1 PDF

NR NR/L3/ELP/SAI25/MOD X ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/MOD X ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable only to areas that are required to adopt a process for securing points of disconnection to form points of isolation (a SIP process) and all future sections of electrification of Network Rail infrastructure.

The requirements of this module are applicable to Network Rail personnel and to Network Rail’s contractors.

This module does not include requirement for the following:

• Work on or about Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system (Sunderland Metro System Operating Area –Module Z).

Purpose 

This module defines the requirements for securing points of disconnection, creating points of isolation, when implementing an Earthed Isolation. 

This module combines relevant local Supplementary Isolation Processes (SIP) that have been implemented into one process and provides a consistent securing process for all future applications. 

The requirements include the specific rules and procedures to be followed so that a sufficient documented safe system of work is prepared and implemented that complies with the Electricity at Work Regulations 1989, specifically Regulation 12.


Edition : 1
File Size : 2 files , 1.7 MB
Number of Pages : 15
Published : 06/03/2023

History

NR NR/L3/ELP/SAI25/MOD X ISSUE 2
Published Date: 12/02/2023
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/ELP/SAI25/MOD X ISSUE 1
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2

Related products

NR BRS-SM 702
Published Date: 07/01/1990
Lifting Barrier (Auto) MKIIB Pin, Contact Box for Mechanism & Column Assembly
$5.7
NR NR/CIV/SD/16M/111 ISSUE D
Published Date: 06/01/2019
Non-Station Footbridges up to 16m (100 series): Supports - Stair Trestles
$5.7
NR NR/L3/MTC/RCS0216/MP25 ISSUE 3
Published Date: 12/02/2023
Risk Control Manual: Use of Rail Croppers for Scrap Rail Recovery
$5.7
NR NR/CIV/SD/1401 ISSUE D
Published Date: 09/02/2017
D-Type Underbridges: Key to Types - Filler Beam Floor
$5.7

Best-Selling Products