NR NR/L3/ELP/SAI25/MOD X ISSUE 2 PDF

NR NR/L3/ELP/SAI25/MOD X ISSUE 2 PDF

Name:
NR NR/L3/ELP/SAI25/MOD X ISSUE 2 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable only to areas that are required to adopt a process for securing points of disconnection to form points of isolation (a SIP process) and all future sections of electrification of Network Rail infrastructure.

The requirements of this module are applicable to Network Rail personnel and to Network Rail’s contractors.

This module does not include requirement for the following:

• Work on or about Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system (Sunderland Metro System Operating Area –Module Z).

Purpose

This module defines the requirements for securing points of disconnection, creating points of isolation, when implementing an Earthed Isolation.

This module combines relevant local Supplementary Isolation Processes (SIP) that have been implemented into one process and provides a consistent securing process for all future applications.

The requirements include the specific rules and procedures to be followed so that a sufficient documented safe system of work is prepared and implemented that complies with the Electricity at Work Regulations 1989, specifically Regulation 12.


Edition : 2
File Size : 1 file , 980 KB
Number of Pages : 15
Published : 12/02/2023

History

NR NR/L3/ELP/SAI25/MOD X ISSUE 2
Published Date: 12/02/2023
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/ELP/SAI25/MOD X ISSUE 1
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2

Related products

NR NR/CIV/SD/458 ISSUE A
Published Date: 04/01/2008
Footbridge Access Chs Main Span Landing Option 2 with Future Ramp
$5.7
NR NB 028 ISSUE 1
Published Date: 10/01/2004
Blackening of Position Light Signal Lamps
$5.7
NR NR/L2/TRK/001/MOD07 ISSUE 9
Published Date: 12/05/2020
Inspection and Maintenance of Permanent Way: Management of Rail Defects
$24.3
NR SMF/SG/0200 ISSUE 1
Published Date: 06/01/2007
Standard Maintenance Form - AWS Site Disconnection Notice
$5.7

Best-Selling Products

SBCCI 5-A
Published Date:
Standard Plumbing Code Handbook
SBCCI SEBC
Published Date: 01/01/1997
STANDARD EXISTING BUILDINGS CODE 1997 EDITION
$20.7
SBCCI SFPC
Published Date: 01/01/1999
STANDARD FIRE PREVENTION CODE
$25.2