NR NR/L3/ELP/SAI25/MOD Y ISSUE 1 PDF

NR NR/L3/ELP/SAI25/MOD Y ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/MOD Y ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to those parts of Network Rail Infrastructure Limited (known as Network Rail) controlled infrastructure equipped with the 750V d.c. overhead line system.

This module applies to Network Rail personnel and Network Rail’s contractors and contains mandatory statements applicable to other persons.

To provide a consistent approach to working on or about 750V d.c. Electrified Lines, Train Operating Companies may, as best practice, apply this module on infrastructure they control.

The module does not include requirement for the following:

• Work on or about Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system 

Purpose

This module sets out the actions to be taken to avoid danger from the presence of d.c. overhead electrified lines.

The requirements of Overhead Line Equipment as defined in this standard apply to the Tram Trains d.c. overhead line, except where indicated in this module.


Edition : 1
File Size : 2 files , 810 KB
Number of Pages : 19
Published : 06/03/2023

History

NR NR/L3/ELP/SAI25/MOD Y ISSUE 2
Published Date: 12/02/2023
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2
NR NR/L3/ELP/SAI25/MOD Y ISSUE 1
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2

Related products

NR RT/CE/S/010 ISSUE 2
Published Date: 10/01/1996
Geotextiles (aka NR/SP/TRK/010)
$13.2
NR NR/L3/MTC/ME0201/CAL087 ISSUE 1
Published Date: 06/07/2008
Calibration of Statimeter Dynamometers
$5.7
NR NR/L3/ELP/27240/NR/DIST C22S ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of Weatherproof Metal Enclosed SF6 Ring Main Unit Ringmaster 2, Yorkshire Switchgear Ltd.
$5.7
NR NR/CIV/SD/1215 ISSUE D
Published Date: 09/02/2017
Z-Type Underbridges: Steelwork General Assembly Details: Square Steel Floor
$5.7

Best-Selling Products

STI/SPFA R972
Published Date: 12/01/2010
Recommended Practice for the Addition of Supplemental Anodes to sti-P3 USTs (R972)
$9
STI/SPFA SP001
Published Date: 01/01/2018
Standard for the Inspection of Aboveground Storage Tanks
$58.5
STI/SPFA SP001
Published Date: 09/01/2011
Standard for the Inspection of Aboveground Storage Tanks
$51
STI/SPFA SP001
Published Date: 02/01/2024
Standard for the Inspection of Aboveground Storage Tanks
$58.5