NR NR/L3/ENV/305 ISSUE 2 PDF

NR NR/L3/ENV/305 ISSUE 2 PDF

Name:
NR NR/L3/ENV/305 ISSUE 2 PDF

Published Date:
03/03/2018

Status:
[ Revised ]

Description:

How to Change Utility Supplies

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This Network Rail standard specifies how to:

a) appoint the Network Rail approved supplier for new utility supplies;

b) install the correct type of metering to minimise Network Rail’s utility cost;

c) upgrade existing supplies;

d) change the use of supplies;

e) disconnect redundant supplies. This Network Rail standard covers all traction and non-traction supplies where Network Rail pays for the ongoing cost of the utility.

It applies to all Network Rail employees who undertake work on the network, and to those suppliers/contractors whose employees undertake work on the network.

NOTE 1: This standard applies to third party supplies e.g. a Train Operating Company (TOC), with the exception that the third party appoints a preferred supplier.

NOTE 2: The Network Rail Business Space contact holds information about Business Space suppliers as specified on NR/L3/ENV/305/F006.

Purpose

The purpose of this Network Rail standard is to:

a) reduce the likelihood of supply disconnections which would disrupt the operational railway;

b) identify the Network Rail approved supplier for new utility supplies;

c) identify the correct type of metering to minimise Network Rail’s utility cost;

d) reduce the lead times in developing and implementing new utility connections;

e) identify available utility capacity for new utility connections and requirements for increased capacity at other locations;

f) improve the accuracy of the asset information held in Network Rail Energy Database (Energylink).


Edition : 2
File Size : 1 file , 680 KB
Number of Pages : 24
Published : 03/03/2018

History

NR NR/L3/ENV/305 ISSUE 3
Published Date: 09/04/2021
How to Change Utility Supplies
$18.6
NR NR/L3/ENV/305 ISSUE 2
Published Date: 03/03/2018
How to Change Utility Supplies
$18.6

Related products

NR NR/SP/ELP/21066 ISSUE 4
Published Date: 04/01/2006
Restrictions on Entry into Substations Equipped with GEC Type KC 33kV Switchgear
$7.5
NR X80160 ISSUE 2
Published Date: 06/07/2003
MCB-CCTV Typical Circuits Barrier Control Circuits (4)
$5.7
NR NR/SMTH/PART 06 ISSUE 7
Published Date: 06/04/2022
Signal Maintenance Testing Handbook (SMTH): Part 06
$18.6
NR BRS-SM 318/11 ISSUE A
Published Date: 02/10/1978
Electric Point Machine W.B.& S.Co Style M3A Machine Slides and Lugs for Use with B.R.B. Connection Rods
$5.7

Best-Selling Products