NR NR/L3/ENV/305 ISSUE 3 PDF

NR NR/L3/ENV/305 ISSUE 3 PDF

Name:
NR NR/L3/ENV/305 ISSUE 3 PDF

Published Date:
09/04/2021

Status:
[ Active ]

Description:

How to Change Utility Supplies

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This Network Rail standard specifies how to:

a)  appoint the Network Rail approved supplier for new utility supplies;

b)  install the correct type of metering to minimise Network Rail’s utility  cost;

c)  upgrade existing supplies;

d)  change the use of supplies;

e)  disconnect redundant supplies.

This Network Rail standard covers all traction and non-traction supplies where Network Rail pay for the ongoing cost of the utility.

It applies to all Network Rail employees who undertake work on the network, and to those suppliers/contractors whose employees undertake work on the network.

NOTE 1:  This standard applies to third party supplies e.g. a Train Operating Company (TOC), with the exception that the third party appoints a preferred supplier.

NOTE 2:  The Network Rail Business Space contact holds information about Business Space suppliers as specified on Form NR/L3/ENV/305/F006 Utility Contact List.

Purpose

The purpose of this Network Rail standard is to:

a)  reduce the likelihood of supply disconnections which would disrupt the operational railway;

b)  identify the Network Rail approved supplier for new utility supplies;

c)  identify the correct type of metering to minimise Network Rail’s utility cost;

d)  reduce the lead times in developing and implementing new utility connections;

e)  identify available utility capacity for new utility connections and requirements for increased capacity at other locations;

f)   improve the accuracy of the asset information held in Network Rail Energy Database (Energy link).


Edition : 3
File Size : 1 file , 1.5 MB
Number of Pages : 24
Published : 09/04/2021

History

NR NR/L3/ENV/305 ISSUE 3
Published Date: 09/04/2021
How to Change Utility Supplies
$18.6
NR NR/L3/ENV/305 ISSUE 2
Published Date: 03/03/2018
How to Change Utility Supplies
$18.6

Related products

NR RT/LS/G/001 ISSUE 1
Published Date: 06/01/2000
Managing Safety Risk
$35.4
NR TWI 2G056 ISSUE 1
Published Date: 03/01/2005
How to Dig a Cutter Bar Trench
$5.7
NR E10000/7/13 ISSUE A
Published Date: 01/01/1993
Signal Control Circuits. Push-Push Panel Push Buttons in One Ring
$5.7
NR BRS-SM 646/5 ISSUE A
Published Date: 08/01/1996
Rail Clamp Point Lock Clamp Plate for Support Beam for Multiple Drive Long Switches
$5.7

Best-Selling Products

ARMY 03101
Published Date: 12/01/1992
FORMWORK FOR CONCRETE
$9.6
ARMY ADS-37A-PRF
Published Date: 05/28/1996
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS (E3) PERFORMANCE AND VERIFICATION REQUIREMENTS
$14.7
ARMY AMC P 715-17
Published Date: 03/15/1994
GUIDE FOR THE PREPARATION AND USE OF PERFORMANCE SPECIFICATIONS
$23.4
ARMY AR 1-100
Published Date: 07/27/2015
The Army Gift Program
$11.7
ARMY AR 1-15
Published Date: 01/31/2017
Civilian Aides to the Secretary of the Army
$10.2
ARMY AR 1-1
Published Date: 05/23/2016
Planning, Programming, Budgeting, and Execution
$14.1