NR NR/L3/INI/CP0026 ISSUE 2 PDF

NR NR/L3/INI/CP0026 ISSUE 2 PDF

Name:
NR NR/L3/INI/CP0026 ISSUE 2 PDF

Published Date:
06/01/2008

Status:
[ Inactive ]

Description:

Process for Locating Buried Services Prior to Ground Penetration

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE * PDF ONLY

This standard applies to all persons, including contractors, engaged to carry out works on Network Rail Infrastructure. It is intended to reduce the risk of damage to buried services during the process of carrying out ground penetration works on the Railway Infrastructure.

Purpose

This standard sets out the Network Rail Infrastructure Investment process for locating buried services prior to ground penetration.

This standard must be read in conjunction with NR/WI/BUS/00114 Buried Services Data Provision and NR/L3/INI/CP0024 Control and Use of Metal Pins and Spikes on Network Rail Infrastructure.


Edition : 2
File Size : 1 file , 340 KB
Number of Pages : 9
Published : 06/01/2008

History

NR NR/L3/INI/CP0026 ISSUE 2
Published Date: 06/01/2008
Process for Locating Buried Services Prior to Ground Penetration
$7.5
NR NR/PRC/MPI/CP0026 ISSUE 1
Published Date: 03/01/2006
Process for Locating Buried Services Prior to Ground Penetration
$7.5

Related products

NR X50430
Published Date: 01/31/1995
MWL CROSSING STANDARDS JR, JPR & SR CIRCUITS SINGLE LINE
$5.7
NR TWI 2G047 ISSUE 1
Published Date: 03/01/2005
How to Measure Rail Depth
$5.7
NR NR/L3/INV/3001/901 ISSUE 2
Published Date: 09/04/2021
Reporting and Investigation Manual: Management of Recommendations and Local Actions
$13.2
NR E10129/25 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region: Ground Frame Controls (Mechanically Operated) Inside Interlocking Areas: Use of Lever Lock I/L/O Key Release Instrument
$5.7

Best-Selling Products