NR NR/L3/INI/CP0036 ISSUE 4 PDF

NR NR/L3/INI/CP0036 ISSUE 4 PDF

Name:
NR NR/L3/INI/CP0036 ISSUE 4 PDF

Published Date:
08/01/2008

Status:
[ Not for New Design ]

Description:

The Provision of Welfare Facilities - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Network Rail Level 3 Procedure specifies the minimum standards for provision of welfare facilities on transient and non-transient work sites while work is undertaken by, or on behalf of, Network Rail.

It applies to all worksites on NRMI where the provision of welfare is the responsibility of Network Rail, Principal Contractors or any contractors or suppliers employed by them.

NOTE Specific legislation might demand a higher standard of welfare facilities, e.g. working with asbestos or lead.

Purpose

The purpose of this standard is to specify the process required whereby all personnel working on NRMI are provided with welfare facilities that are clean, properly maintained and fit for purpose.

This standard interprets the Construction (Design and Management) Regulations 2007 and other applicable Health and Safety legislation.


Edition : 4
File Size : 2 files , 1.7 MB
Number of Pages : 18
Published : 08/01/2008

History

NR NR/L2/OHS/CP0036 ISSUE 5
Published Date: 06/01/2024
The Provision of Welfare Facilities for Temporary and Transient Work Activities (formerly NR/L3/INI/CP0036)
$13.2
NR NR/L3/INI/CP0036 ISSUE 4
Published Date: 08/01/2008
The Provision of Welfare Facilities - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L3/INI/CP0036 ISSUE 3
Published Date: 03/01/2008
The Provision of Welfare Facilities
$13.2

Related products

NR BRS-SM 440/H7 ISSUE A
Published Date: 08/08/1994
Signal Equipment Framework Track Capacitor Mounting Plate for Apparatus Cases and REB's
$5.7
NR BRS-SE 84/2
Published Date: 08/08/1979
Level Crossing Warning Arrangements Reflector Mounting Bracket for Miniature Red/Green Signal Unit
$5.7
NR NR/L3/ELP/3091/MODD ISSUE 1
Published Date: 09/07/2019
DC Conductor Rail Electrified Lines Working Instructions: Short Circuiting of the Conductor Rail Equipment
$5.7
NR TEF 3231 ISSUE 1
Published Date: 09/01/2013
No fault found investigation report
$5.7

Best-Selling Products

AI/ASPHALT AI MS-16
Published Date: 03/01/1983
ASPHALT IN PAVEMENT PRESERVATION & MAINTENANCE
AI/ASPHALT AI MS-17
Published Date: 01/01/1969
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 06/01/1983
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 01/01/2000
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-1
Published Date: 01/01/2008
THICKNESS DESIGN ASPHALT PAVEMENTS FOR HIGHWAYS & STREETS
$19.5
AI/ASPHALT AI MS-22
Published Date: 01/01/1983
CONSTRUCTION OF HOT MIX ASPHALT PAVEMENTS
$8.7