NR NR/L3/INI/CP0065 ISSUE 1 PDF

NR NR/L3/INI/CP0065 ISSUE 1 PDF

Name:
NR NR/L3/INI/CP0065 ISSUE 1 PDF

Published Date:
12/04/2010

Status:
[ Withdrawn ]

Description:

Investment Projects Enhancements - Engineering Management Plan

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

The processes and arrangements described in this EMP are mandatory for all projects undertaken within IPE. The EMP should always be read in conjunction with NR/L2/INI/02009.

When other Programmes within Investment Projects (IP), Asset Management (Track) or Infrastructure Maintenance deliver works on behalf of IPE this EMP will apply unless otherwise formally agreed by the IPE Senior Programme Engineering Manager (SPEM) prior to the commencement of the work.

The EMP applies whether the design for a project is undertaken by Network Rail staff or by Suppliers contracted to Network Rail

This EMP applies to projects which protect Network Rail's asset when a party other than Network Rail carries out work alongside, on, over or under Network Rail property unless otherwise varied by an approved asset protection agreement

The EMP also applies when a third party carries out work on Network Rail's assets.

Exceptionally, a Programme Engineering Manager (PEM) may prepare an alternative EMP for a specific project that is not suited to these arrangements. Alternative EMP's are approved by the SPEM and authorised by the Senior Programme Manager (SPM) prior to the commencement of the work.

Purpose

The purpose of this document is to define the engineering management roles and responsibilities within Investment Projects Enhancements (IPE) in accordance with the requirements of Company Standard, Engineering Management for Projects, NR/L2/INI/02009.

It provides Designated Project Engineers (DPE), Project Engineers (PE), Project Managers (PM) and others identified within the Engineering Management Plan (EMP) clear direction regarding the engineering management arrangements and processes for all IPE projects.


Edition : 1
File Size : 1 file , 300 KB
Number of Pages : 39
Published : 12/04/2010

History


Related products

NR NR/L2/SIG/30014/A110 ISSUE 7
Published Date: 09/07/2024
Signalling Works Testing Handbook: Use of OTP for Piling
$24.3
NR BRS-SM 29
Published Date: 04/01/1961
Glazing Seals for U.Q. Signal Spectacle
$5.7
NR E10000/85A ISSUE A
Published Date: 10/01/1991
Relay Set Plug in 5PO 3000 Type Relays Type A
$5.7
NR NR/L3/SCO/311/13 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Facilities, Planning and Supervision
$13.2

Best-Selling Products

A Textbook of Soil Chemical Analysis
Published Date: 01/11/1972
$29.7
An Encyclopedia of Candy and Ice-Cream Making
Published Date: 02/02/1959
$37.5
Asphalt
Published Date: 12/12/1971
$30
Basic Microscope Techniques
Published Date: 02/02/1971
$22.5