Name:
NR NR/L3/SCO/311/13 ISSUE 3 PDF
Published Date:
03/05/2022
Status:
[ Active ]
Publisher:
Network Rail
This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).
This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.
SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.
On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module
Purpose
This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.
This module has been created to provide instructions on the arrangements for maintenance facilities and locations used for maintenance of the Supply Chain Operations (SCO) managed fleet.
This module provides minimum requirements for the planning and supervising of work to deliver safe maintenance.
This instruction replaces the requirement for depot registration as detailed in NR/L2/RVE/01327.
The application of the requirements and procedures contained within this manual mitigate the following high level risks:
a) Non-compliance with legislation and regulatory requirements.
b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.
c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure
| Edition : | 3 |
| File Size : | 1 file , 260 KB |
| Number of Pages : | 17 |
| Published : | 03/05/2022 |