NR NR/L3/INI/P3M/128 ISSUE 2 PDF

NR NR/L3/INI/P3M/128 ISSUE 2 PDF

Name:
NR NR/L3/INI/P3M/128 ISSUE 2 PDF

Published Date:
03/02/2019

Status:
[ Withdrawn ]

Description:

Project, Programme and Portfolio Management (P3M), Commercial and Engineering Functions Assurance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies the processes to be adopted, and the roles and responsibilities associated, with assurance of the P3M framework. This standard describes how the P3M, Commercial and Engineering functions undertake their own assurance activities and are assured at 1st and 2nd line.

This standard is part of the P3M framework and relates to NR/L1/INI/P3M/100, and NR/L2/INI/P3M/105. It applies to all projects and programmes that require Investment Authority, as defined within IR01, Investment Regulations, and:

a) enhance or renew the operational railway; and / or

b) are carried out in a high street environment, e.g. car park developments.

This standard specifies the process to be adopted, as well as the roles and roles’ responsibilities associated with assurance of projects, programmes and portfolios delivered within the P3M framework. This Standard specifies specific assurance activities for 1st and 2nd line to be undertaken in accordance with figure 1.

NOTE 1: IR01, Investment Regulations, is available on Connect (IR01 is an internal document available to staff within Network Rail only, it can be made available upon request to [email protected]: http://connectdocs/NetworkRail/Documents/CorporateServices/Finance/FinancialControl/Investment%20Regulations.pdf

NOTE 2: See the following link for definitions of projects, programmes, and portfolios in Network Rail. This information is available externally on request to [email protected]. http://oc.hiav.networkrail.co.uk/sites/GRIP/Core%20Documents/P3M%20Definitions.pdf

Purpose

The purpose of this standard is to describe the Network Rail assurance activities undertaken in relation to the project, programme and portfolio management (P3M) framework, and to identify who is accountable for carrying out the activities. The assurance activities provide Network Rail with oversight and confidence in the progress of its portfolio and that the correct governance is being adhered to. This standard further supports and defines the controls, processes, responsibilities and accountabilities defined NR/L2/INI/P3M/105, which include the “Lines of Defence” model, for the assurance of activity undertaken in accordance with the P3M framework (NR/L1/INI/P3M/100).

Adherence to this standard will help increase the successful delivery of Network Rail’s portfolio and reduce associated reputational and financial risks. It creates a common set of working practices to provide a consistent approach in assuring the portfolio and projects / programmes within it.

There are no legal obligations associated with this standard.


Edition : 2
File Size : 1 file , 1 MB
Number of Pages : 20
Published : 03/02/2019

History


Related products

NR BRS-SM 312/6 ISSUE C
Published Date: 09/06/1974
F.P. Lock Bar Fittings Collar for Shouldered Pin
$5.7
NR X50440
Published Date: 01/31/1995
MWL CROSSING STANDARDS CONTROL & INDICATION CIRCUITS SINGLE LINE
$5.7
NR T25215 ISSUE 2
Published Date: 03/01/2014
Lineside and On-Track Typical Circuits - POINTS - Clamp Locks - SSI. SSI Module Output and Input Circuits
$5.7
NR RT/E/G/00018 ISSUE 1
Published Date: 02/01/2003
Index of Railtrack Documents Relating to Lineside Security Requirements
$18.6

Best-Selling Products