NR NR/L3/INI/P3M/131/01 ISSUE 1 PDF

NR NR/L3/INI/P3M/131/01 ISSUE 1 PDF

Name:
NR NR/L3/INI/P3M/131/01 ISSUE 1 PDF

Published Date:
03/03/2018

Status:
[ Revised ]

Description:

Document Management Manual: Document Management Procedure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-ini-p3m-131-01-issue-1_2760460

Choose Document Language:
13.20 €
Need Help?
PDF ONLY * SEE NR/L3/P3M/131/MOD01

This module specifies the processes, roles and responsibilities associated with the management of documentation as part of the Governance of Railway Investment Projects (GRIP) project delivery framework.

This module is part of the Portfolio, Programme and Project Management (P3M) framework and relates to NR/L2/INI/P3M/101, it also supports NR/L2/INF/02220. It applies to all projects and programmes that require Investment Authority, as defined within IR01, Investment Regulations, and:

a) enhance or renew the operational railway; and / or

b) are carried out in a high street environment, e.g. car park developments.

This module specifies requirements for controlled and uncontrolled document development and distribution, archive and hand back. This includes attachments to documents.

NOTE 1: IR01, Investment Regulations, is available on Connect (IR01 is an internal document available to staff within Network Rail only. It can be made available externally on request to [email protected] ):

http://connectdocs/NetworkRail/Documents/CorporateServices/Finance/FinancialControl/Investment% 20Regulations.pdf

Purpose

The purpose of this module is to define and mandate the processes for managing documentation of all kinds, from initial concept to close out. This module forms part of the Project, Programme and Portfolio (P3M) framework, within which its objectives are to:

a) demonstrate that appropriate attention is given to the management and control of documentation;

b) provide a standardised governance framework within the organisation; and

c) provide a single point of reference on the processes relating to the management of documentation.

The approach is based on best practice within industries that undertake major infrastructure projects and practice recommended by the major professional bodies. Implementation of this module will reduce the reputational and financial risk related to the delivery of complex projects.

This module supports the progressive adoption of the BS1192 document referencing system on all projects and is a fundamental requirement of applying Building Information Modelling (BIM) on projects.


Edition : 1
File Size : 1 file , 540 KB
Number of Pages : 20
Published : 03/03/2018

History

NR NR/L3/P3M/131/MOD01 ISSUE 2
Published Date: 06/05/2021
Document Management Manual: Document Management Procedure
13.20 €
NR NR/L3/INI/P3M/131/01 ISSUE 1
Published Date: 03/03/2018
Document Management Manual: Document Management Procedure
13.20 €

Related products

NR SMF/ME/0279 ISSUE 1
Published Date: 06/01/2008
Parts Requisition Form
5.70 €
NR NR/L2/SIG/30014/D120/TS13-01 ISSUE 1
Published Date: 12/01/2012
Signalling Works Testing: Train Describer (TD) Test Specification
13.20 €
NR X21130 ISSUE 3
Published Date: 08/07/2004
ABCL TYPICAL CIRCUITS SINGLE LINE AUDIBLE WARNING CIRCUITS
5.70 €
NR RT/CE/P/022 ISSUE 1
Published Date: 09/01/1996
Controlling the Use of Public Road Bridges by Heavy Abnormal Road Loads
7.50 €

Best-Selling Products

NR 5002881/R/71310/001 ISSUE 4
Published Date: 04/01/2004
Standard Brickwork & Masonry Repair Details - Approval in Principle
24.30 €
NR 656JRM02 ISSUE 1.2
Published Date: 09/13/2000
PC-BASED ISM TERMINAL HARDWARE SPECIFICATION
7.50 €
NR 656JRM03 ISSUE 1.1
Published Date: 09/11/2000
PC Based ISM Terminal Installation & Maintenance Manual
13.20 €
NR 684021-BTA-00-101 ISSUE 3
Published Date: 12/01/2008
Form A & B: Traditional Front Wall Platform
35.40 €
NR 684021-BTA-00-102 ISSUE 1
Published Date: 12/17/2008
Form A & B: Crosswall & Precast Planks
35.40 €
NR 84-YS-1003/30 ISSUE H
Published Date: 04/02/2005
CCTV Monitored L.C. - Standard S.B. Control Unit Construction Details Index
5.70 €