NR NR/L3/INI/PG115/PS/004 ISSUE 1 PDF

NR NR/L3/INI/PG115/PS/004 ISSUE 1 PDF

Name:
NR NR/L3/INI/PG115/PS/004 ISSUE 1 PDF

Published Date:
06/04/2011

Status:
[ Withdrawn ]

Description:

Planning and Programme Controls: Guidance on the Interface with Contractor Plans

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This Guidance Note provides guidance on method(s) of interfacing Network Rail Investment Project & Asset Management (Renewals) project plans and schedules with those of its contractors.

Purpose

This Guidance Note forms part of the suite of documents comprising the Planning and Programme Controls standard.

The programme controls framework exists so that investment projects in Network Rail are delivered successfully to meet their time, cost and quality targets.


Edition : 1
File Size : 1 file , 170 KB
Number of Pages : 18
Published : 06/04/2011

History


Related products

NR RT/ETE/4/2/2
Published Date: 05/19/1998
General Arrangement of Track Isolating Switch (Type 1.D)
$5.7
NR BRS-SM 2556
Published Date: 01/30/1995
Mechanical Backdrive Mounted in 4' on LHS for Full Depth FV Layout Point Machine Mounted on RHS
$5.7
NR NR/CIV/SD/641 ISSUE C
Published Date: 09/02/2017
Steelwork Repairs: Typical Top Hat Strengthening Detail Sheet 2 of 2
$5.7
NR RT/CE/S/037 ISSUE 3
Published Date: 12/01/2000
Requirements for Maintenance of Trackwork in Depots by Depot Facility Operators (aka NR/SP/TRK/037)
$13.2

Best-Selling Products