NR NR/L3/INI/PG115/PS/013 ISSUE 1 PDF

NR NR/L3/INI/PG115/PS/013 ISSUE 1 PDF

Name:
NR NR/L3/INI/PG115/PS/013 ISSUE 1 PDF

Published Date:
06/05/2010

Status:
[ Withdrawn ]

Description:

Planning and Programme Controls: Guidance on Project Schedule Model Baseline Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

This Network Rail Guidance Note provides an outline of the recognised baselines that can be associated with and utilised to support the generation, management and update of the project schedule model.

The management and change control associated with these baselines is covered in an associated guidance note NR/L3/PG115/PS/014, Guidance on Project Schedule Model Change Control.

Purpose

This Guidance Note forms part of the suite of documents comprising the Planning and Programme Controls standard.

Schedule Model baseline management outlines the agreed standard Network Rail schedule model baselines types, how and when they are established, allied with the appropriate update and archive processes.


Edition : 1
File Size : 1 file , 39 KB
Number of Pages : 7
Published : 06/05/2010

History


Related products

NR X22190 ISSUE 2
Published Date: 08/07/2004
ABCL Typical Circuits Double Line Bi-Directional Monitor Circuits (2)
$5.7
NR BR 945 ISSUE 1
Published Date: 08/01/1981
Miniature Tractive Armature DC Lamp Proving Relay (Plug-In Type) for Flashing Signals for Railway Signalling Purposes
$13.2
NR NR/L2/OHS/501/P1 ISSUE 2
Published Date: 12/03/2022
Trackworker Protection and Warning Systems: Module P1: Track Circuit Operating Device (TCOD)
$13.2
NR BRS-SM 52570
Published Date: 01/30/1995
Parts Schedule for Mechanical Backdrive Mounted in 4' Full Depth CV Layout Clamp Lock Operated
$5.7

Best-Selling Products

The Complete FreeBSD
Published Date: 06/01/1999