NR NR/L3/INV/3001/903 ISSUE 2 PDF

NR NR/L3/INV/3001/903 ISSUE 2 PDF

Name:
NR NR/L3/INV/3001/903 ISSUE 2 PDF

Published Date:
09/04/2021

Status:
[ Active ]

Description:

Reporting and Investigation Manual: Risk Ranking Events Including Operational Close Calls, Their Reporting and Level 1 Investigations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to all events including an operational close call/irregular working:

a) occurring on Network Rail managed infrastructure (NRMI);

b) occurring on Network Rail managed stations;

c) occurring on Network Rail - Rail Infrastructure Development Centre infrastructure (RIDC);

d) involving Network Rail employees whilst on duty;

e) involving employees of contractors whilst undertaking work for Network Rail.

This module covers all events including operational close calls/irregular working i.e. that have the potential to cause loss or harm. 

This module does not affect or amend a line manager’s responsibility for takingappropriate action to maintain safety of the operation or a location.

Purpose

This module provides a consistent, comprehensive and structured process within Network Rail for the risk ranking events including operational close calls/irregular working, their reporting and level 1 investigations. 


Edition : 2
File Size : 1 file , 260 KB
Number of Pages : 12
Published : 09/04/2021

History

NR NR/L3/INV/3001/903 ISSUE 2
Published Date: 09/04/2021
Reporting and Investigation Manual: Risk Ranking Events Including Operational Close Calls, Their Reporting and Level 1 Investigations
$13.2
NR NR/L3/INV/3001/903 ISSUE 1
Published Date: 12/05/2020
Reporting and Investigation Manual: Risk Ranking Events Including Operational Close Calls, Their Reporting and Level 1 Investigations
$13.2

Related products

NR T28087 ISSUE 1
Published Date: 06/10/2009
Lineside and on Track Equipment Typical Circuits Signals and Indicators Splitting Distant Complex Controls (1) (Left Hand Divergence)
$5.7
NR NR/L2/TRK/6100 ISSUE 6
Published Date: 06/03/2023
The Installation and Maintenance of Stretcher Bars
$13.2
NR NR/CIV/SD/1120 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Vehicle Collision Restraining Device: Single Track - 2 Girders & Double Track - 2 or 3 Girders General Arrangement 1
$5.7
NR TWI 2S010 ISSUE 1
Published Date: 03/01/2005
How to Replace Slide Baseplates or Chairs in S&C
$7.5

Best-Selling Products

Handbook of Applied Photometry
Published Date: 12/01/1997
$29.7