NR NR/L3/MTC/II0219 ISSUE 3 PDF

NR NR/L3/MTC/II0219 ISSUE 3 PDF

Name:
NR NR/L3/MTC/II0219 ISSUE 3 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Intelligent Infrastructure Remote Condition Monitoring Manual

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-mtc-ii0219-issue-3_2780053

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This Network Rail document applies to the installation and management of II RCM systems and associated hardware on Network Rail Managed Infrastructure (NRMI).

It applies to:

a) staff involved in design, installation, testing & commissioning, configuration and calibration of the system; and

b) technical and operational staff involved with operating and managing the II RCM system.

Purpose

This document provides a process for installation, use and management of II RCM remote condition monitoring systems of infrastructure assets so they are used in a correct and consistent manner to:

a) enable proactive maintenance of Network Rail assets to be undertaken based on historic performance data so that the performance of the asset continues to meet its specified level; and

b) deliver improved fault finding on failed or failing assets through identifying in specific cases the system or component that has failed, thereby directing the fault staff to this component, resulting inreduced unavailability of the system or equipment.

Predicting and preventing failures improves the availabilityof systems and equipment and will reduce financial penalties incurred by train delays attributed to the system unavailability.


Edition : 3
File Size : 1 file , 610 KB
Number of Pages : 11
Published : 03/07/2020

History

NR NR/L3/MTC/II0219 ISSUE 5
Published Date: 06/01/2024
Intelligent Infrastructure Remote Condition Monitoring Manual
13.20 €
NR NR/L3/MTC/II0219 ISSUE 4
Published Date: 06/03/2023
Intelligent Infrastructure Remote Condition Monitoring Manual
13.20 €
NR NR/L3/MTC/II0219 ISSUE 3
Published Date: 03/07/2020
Intelligent Infrastructure Remote Condition Monitoring Manual
13.20 €

Related products

NR NR/CIV/SD/1201 ISSUE E
Published Date: 06/01/2019
Z-Type Underbridges: Key to Types
5.70 €
NR RT/CE/S/033 ISSUE 2
Published Date: 02/01/1998
Track Blanketing Sand (aka NR/SP/TRK/033)
7.50 €
NR NR/L2/SIG/30009/E430 ISSUE 1
Published Date: 12/01/2007
Signalling Principles - Provision of Derailment Detectors
7.50 €
NR NR/CIV/SD/1724 ISSUE C
Published Date: 12/01/2018
Concrete Underbridges: Details: Cast on Site Exposed Bottom Flanges Filler Beam Deck
5.70 €

Best-Selling Products

AIST/ISS DIR-20
Published Date: 01/01/2020
2020 Directory Iron and Steel Plants
56.70 €
AIST/ISS PB-084
Published Date: 01/01/2002
Rolls for the Metalworking Industries
52.50 €
AIST/ISS PB-099
Published Date: 01/01/2004
Continuous Casting, Volume 10: Tundish Operations
29.40 €
AIST/ISS PB-126
Published Date: 01/01/2003
Austenite Formation and Decomposition
42.00 €
AIST/ISS PB-127
Published Date: 01/01/2003
Modeling, Control, and Optimization in Ferrous and Non-Ferrous Industry
51.90 €
AIST/ISS PB-210
Published Date: 01/01/2010
Bar Steels: Steel Products Manual
31.50 €