NR NR/L3/MTC/ME0300/12 ISSUE 1 PDF

NR NR/L3/MTC/ME0300/12 ISSUE 1 PDF

Name:
NR NR/L3/MTC/ME0300/12 ISSUE 1 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Mobile Maintenance Train Operational Procedures: MMT Working out-of-gauge

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to all the MMTs owned and operated by Network Rail Infrastructure Maintenance (IM) and all Network Rail staff. The procedure works in collaboration with applicable standards of any Railway Undertaking (RU) contracted to operate the MMT.

This module is applicable to all modes of operation when the MMT will operate next to an open adjacent line and exceed W6A gauge by going Out-of-Gauge (OOG).

Purpose

This module provides operational processes that reduce the risk of the out of gauge MMT colliding with a passing train or track side structure.


Edition : 1
File Size : 1 file , 320 KB
Number of Pages : 10
Published : 06/04/2022

History


Related products

NR NR/CIV/SD/FORMB/2000 ISSUE B
Published Date: 05/01/2013
Conarch Overbridge Design Form B
$7.5
NR NR/L2/SIG/30097/APPC ISSUE 3
Published Date: 04/07/2014
Modular Signalling: Appendix C: System Functionality
$18.6
NR NR/L2/TRK/001/A01 ISSUE 4
Published Date: 12/05/2009
Inspection and Maintenance of Permanent Way - Inspection
$24.3
NR NR/CIV/SD/1325 ISSUE G
Published Date: 03/01/2019
U-Type Underbridges: Main Girder: Spans up to 20m - Sheet 2 of 2
$5.7

Best-Selling Products

REA B50-1
Published Date: 10/04/1988
REA Standard T-805B, Electric Transmission Specifications and Drawings, 115 kv through 230 kV
$17.1