NR NR/L3/MTC/ME0300/14 ISSUE 1 PDF

NR NR/L3/MTC/ME0300/14 ISSUE 1 PDF

Name:
NR NR/L3/MTC/ME0300/14 ISSUE 1 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Mobile Maintenance Train Operational Procedures: MMT Working in a Structure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This procedure applies to all the MMTs owned and operated by Network Rail Infrastructure Maintenance (IM) and all Network Rail staff. The procedure works in collaboration with applicable standards of any Railway Undertaking (RU) contracted to operate the MMT.

This module covers the MMT working in or partially in anything that is defined as a structure.

Concurrent structure separated by a railway cutting or other area with limited or no position of safety shall be considered as a continuous structure for the purposes of this module.

This includes a structure that abuts either a viaduct or bridge where there is no position of safety. 

Purpose 

This module controls the risk that working in a structure imposes on the Mobile Maintenance Train (MMT).


Edition : 1
File Size : 1 file , 120 KB
Number of Pages : 4
Published : 06/04/2022

History


Related products

NR T25122 ISSUE 2
Published Date: 04/05/2003
Lineside & on Track Equipment Typical Circuits Points Power Points, Control & Combined Detection, (Machine Type) Two Locations, Location 1
$5.7
NR RT/K/G/00001 ISSUE 1
Published Date: 04/01/2000
Tender Invitations for the Installation & Upgrading of Lifts
$24.3
NR BRS-SM 318/5 ISSUE B
Published Date: 12/04/1972
ML Electric Point M/C Type JEA50/ML2 Showing Connections
$5.7
NR NR/L3/CIV/140/150C ISSUE 1
Published Date: 05/01/1997
Model Clause 150: Brickwork, Blockwork & Masonry
$7.5

Best-Selling Products

PFI ES11
Published Date: 01/01/1996
Permanent Marking on Piping Materials
PFI ES16
Published Date: 01/01/1985
Access Holes, Bosses and Plugs for Radiographic Inspection of Pipe Welds
PFI ES1
Published Date: 07/01/1995
Internal Machining & Solid Machined Backing Rings for Circumferential Butt Welds
PFI ES20
Published Date: 01/01/1997
Wall Thickness Measurement by Ultrasonic Examination
PFI ES21
Published Date: 01/01/1992
Internal Machining & Fit-Up of GTAW Root Pass Circumferential Butt Welds
PFI ES22
Published Date: 01/01/1995
Recommended Practice for Color Coding of Piping Materials