NR NR/L3/MTC/MG0027 ISSUE 2 PDF

NR NR/L3/MTC/MG0027 ISSUE 2 PDF

Name:
NR NR/L3/MTC/MG0027 ISSUE 2 PDF

Published Date:
06/01/2008

Status:
[ Inactive ]

Description:

Asset Data Management for Maintenance (aka NR/L3/EBM/MG0027)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This procedure shall apply:

• When adding, removing, or changing assets and maintenance regimes as a result of project works – please see Sections 4.1, 4.3, 4.4 and 4.10;

• When adding, removing, and changing asset characteristics and maintenance regimes during maintenance – please see Section 4.5; and

• When verifying asset information – please see Section 4.6.

Purpose

This document describes the process that shall be used to update data concerning the infrastructure assets of Network Rail.

This procedure implements within the Maintenance function the requirements of Network Rail Specification NR/SP/BUS/02250 Asset Data Management, and applies only to those assets that are maintained by Maintenance.


Edition : 2
File Size : 1 file , 380 KB
Number of Pages : 14
Published : 06/01/2008

History

NR NR/L3/MTC/MG0027 ISSUE 2
Published Date: 06/01/2008
Asset Data Management for Maintenance (aka NR/L3/EBM/MG0027)
$13.2
NR NR/PRC/MTC/MG0027 ISSUE 1
Published Date: 10/14/2005
Asset Data Management for Maintenance
$13.2

Related products

NR T25243 ISSUE 1
Published Date: 09/04/2010
Lineside & On Track Typical Circuits Points Clamp Lock MK2 Detection Circuits for Use with Standard, In-Bearer & Hy-Drive Systems, Mechanisms Individually Detected (3), R.H.S.N.C - L.H. Mechanism, where D.C. Traction Immunity is Required
$5.7
NR NR/L3/ELP/29987 ISSUE 9
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines
$18.6
NR BRS-SM 440/J1 ISSUE C
Published Date: 08/08/1994
Signal Equipment Framework Large SSI Rail for Apparatus Cases and REB's
$5.7
NR NR/L3/TRK/1101 ISSUE 3
Published Date: 09/04/2010
The Management of Rail Defect Removal Timescales
$13.2

Best-Selling Products

SN-CEN/TR 10261:2008
Published Date: 07/30/2008
Iron and steel — Review of available methods of chemical analysis
SN-CEN/TR 10261:2013
Published Date: 02/27/2013
Iron and steel — European standards for the determination of chemical composition
SN-CEN/TR 10261:2018
Published Date: 10/03/2018
Iron and steel — European standards for the determination of chemical composition
SN-CEN/TR 10261:2023
Published Date: 05/12/2023
Iron and steel — European standards for the determination of chemical composition
SN-CEN/TR 1030-2:2016
Published Date: 05/04/2016
Hand-arm vibration — Guidelines for vibration hazards reduction — Part 2: Management measures at the workplace
SN-CEN/TR 10317:2009
Published Date: 07/15/2009
European certified reference materials (EURONORM-CRMs) for the determination of the chemical composition of iron and steel products prepared under the auspices of the European Committee for Iron and Steel Standardization