NR NR/L3/TRK/1101 ISSUE 3 PDF

NR NR/L3/TRK/1101 ISSUE 3 PDF

Name:
NR NR/L3/TRK/1101 ISSUE 3 PDF

Published Date:
09/04/2010

Status:
[ Active ]

Description:

The Management of Rail Defect Removal Timescales

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Procedure defines the process, roles and responsibilities in the management of occasional short term dispensations for the exceedence of maximum allowable timescales for the removal of discrete rail defects, as described above.

The process and the template Temporary Dispensation Application Form, Appendix A, supported by the templated risk assessment forms, Appendices B & C must be used. On these sites, the SM[T] must propose risk controls, appropriate to the site, for review by the Track Maintenance Engineer.

This Procedure must not be used to provide dispensation to the requirements defined in Network Rail Standards for the imposition of ESRs or TSRs.

For sites with Rolling Contact Fatigue, the minimum actions and timescales prescribed in NR/L2/TRK/001/B01 shall be achieved, these sites are not covered by this Procedure,

Purpose

The minimum actions for the removal of rail defects, including timescales and, where appropriate, risk controls, are defined in Network Rail Standards :-

  • NR/L2/TRK/001/B01, Inspection and Maintenance of Permanent Way – Rail Management.
  • NR/L2/TRK/0032, Joining Of Rails By Aluminothermic Welding
  • NR/L2/TRK/053, Inspection and Repair Procedures to Reduce the Risk of Derailment at Switches.
  • NR/L2/TRK/054, Inspection of Cast Crossings and Cast Vees in The Track
  • NR/L2/TRK/0132, Weld Repair of Rails

This procedure does not cover the Temporary non-compliance process as covered by NR/L2/EBM/STP/001 Network Rail Standards Management – Process Requirements.

Where there is a justifiable reason for inability to comply with the specified maximum timescales for the removal of discrete defects, a TME (or nominated deputy authorised by the RAM (Track) in their absence) is authorised to approve a temporary dispensation to extend the removal timescales. This approval must be supported by a risk assessment supplied by the Section Manager [Track] (SM[T]), which includes the imposition of any additional risk controls, as appropriate.


Edition : 3
File Size : 1 file , 240 KB
Number of Pages : 19
Published : 09/04/2010

History


Related products

NR NR/L2/CIV/191/02 ISSUE 2
Published Date: 06/03/2023
Mining Manual: Planning Consultations for Mineral Extraction
$13.2
NR RT/CE/S/014 ISSUE 1A
Published Date: 10/01/1997
Rail Testing - Detection Criteria (aka NR/SP/TRK/014)
$13.2
NR NR/L3/ELP/27052/01 ISSUE 2
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: Description of Electrification System
$7.5
NR BRS-SM 2063 ISSUE D
Published Date: 03/08/1995
Colour Light Signals General Assembly of Signals For 1500 Wide Platform with Central Post & Footstep
$5.7

Best-Selling Products