NR NR/L3/MTC/MG0176/08 ISSUE 3 PDF

NR NR/L3/MTC/MG0176/08 ISSUE 3 PDF

Name:
NR NR/L3/MTC/MG0176/08 ISSUE 3 PDF

Published Date:
09/04/2010

Status:
[ Active ]

Description:

Ellipse Work Management Handbook: Works Management Reporting Tools

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document shall be used by those staff involved in the planning process for maintenance.

Purpose

To date most of the focus in Ellipse has been on resolving data quality issues, managing backlog and staff engagement. All of this is key to providing us with a solid platform to build upon.

Having achieved much improvement with data quality and backlog management the time is now pressing to change the emphasis to use Ellipse as a tool.

Infrastructure Maintenance needs to deliver the annual plan in the most efficient way, achieving both output and financial targets whilst maintaining compliance. Ellipse has a key role to play in this, both from a scheduling and planning perspective but also from a performance monitoring perspective.

To put this into context we need to do the right work, at the right time in the most effective manner:

• The right work is as laid down in the annual plan

• The right time is maintaining the schedules that are produced and are delivered week in week out as these should support the delivery of the annual plan

• The most effective manner is using the right resource in the most productive way

To measure how effective we are in delivering the above we shall be utilising the Ellipse reports listed in section 8.3.


Edition : 3
File Size : 1 file , 150 KB
Number of Pages : 11
Published : 09/04/2010

History


Related products

NR T28303 ISSUE 1
Published Date: 04/01/2006
Lineside & On Track Equipment Typical Circuits Signals & Indicators Colour Light, Lighting Circuit, Single Aspect SSI (Dorman LED)
$5.7
NR NR/L3/ELP/27240/NR/DIST C20A ISSUE 6
Published Date: 06/03/2023
Routine Inspection and Maintenance of Substations and Associated Buildings on DC Electrified Lines
$7.5
NR T25611 ISSUE 3
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points HPSS - Double End Location Internal Circuits. WJR in Location
$5.7
NR NB 152 ISSUE 1
Published Date: 02/13/2017
Insulation of Unterminated Wires
$5.7

Best-Selling Products

HIMA MD70.1
Published Date: 08/19/1983
MEDICAL MATERIEL - LUER TAPER FITTINGS - PERFORMANCE
$2.4