NR NR/L3/NDS/006 ISSUE 1 PDF

NR NR/L3/NDS/006 ISSUE 1 PDF

Name:
NR NR/L3/NDS/006 ISSUE 1 PDF

Published Date:
09/03/2011

Status:
[ Active ]

Description:

NDS Process for the Management of Fatigue and Working Hours for Employees Undertaking Safety Critical Work

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard outlines the requirements for managing fatigue and working hours. It applies to all NDS employees who undertake safety critical work, and to those suppliers whose employees undertake safety critical work on Network Rail controlled infrastructure.

Specific requirements are set out for line managers or other identified roles who:

• Have responsibility for the rostering and/or management of staff who undertake safety critical work, and/or

• Are responsible for arranging, placing, controlling and monitoring of contracts which involve undertaking safety critical work on Network Rail controlled infrastructure.

The scope of this standard includes controls for:

• Working hours

• Exceedances of working time limits

• Design and risk assessment of working patterns and rosters

• Management of fatigue

• Monitoring and review of arrangements for managing fatigue and working hours.

Purpose

This standard defines the requirements for managing fatigue and working hours for National Delivery Service (NDS) employees, and those employed under contract by NDS, who undertake safety critical work. Its purpose is to reduce the risks to health and safety that are associated with working patterns, shift work and excessive working hours.

This standard also demonstrates the means by which Network Rail will comply with Regulation 25 of the Rail and Other Guided Transport Systems (Safety) Regulations 2006. The regulation states that:

1. "Every controller of safety critical work shall have in place arrangements to ensure, so far as is reasonably practicable, that a safety critical worker under his management, supervision or control does not carry out safety critical work in circumstances where he is so fatigued or where he would be liable to become so fatigued that his health and safety or the health and safety of other persons on a transport system could be significantly affected.

2. The arrangements in paragraph (1) shall be reviewed by the controller of safety critical work where he has reason to doubt the effectiveness of those arrangements."

 


Edition : 1
File Size : 1 file , 440 KB
Number of Pages : 27
Published : 09/03/2011

History


Related products

NR SMF/PL/0040 ISSUE 1
Published Date: 02/01/2006
Notice (WES)
$5.7
NR RT/CE/C/016 ISSUE 1
Published Date: 06/01/2000
Assessment of Strength of Rails with Localised Head Loss in Tunnels
$18.6
NR NB 134 ISSUE 6
Published Date: 03/26/2024
Transpositions on DC Track Circuits
$5.7
NR X22100 ISSUE 2
Published Date: 02/05/2000
ABCL Typical Circuits Rail Signal Control Circuits Double Line Bi-Directional
$5.7

Best-Selling Products

SN-CEN ISO/IEC TR 25060:2017
Published Date: 04/12/2017
Systems and software engineering — Systems and software product Quality Requirements and Evaluation (SQuaRE) — Common Industry Format (CIF) for usability: General framework for usability-related information (ISO/IEC TR 25060:2010)