NR NR/L3/OCS/043/5.7 ISSUE 3 PDF

NR NR/L3/OCS/043/5.7 ISSUE 3 PDF

Name:
NR NR/L3/OCS/043/5.7 ISSUE 3 PDF

Published Date:
03/03/2012

Status:
[ Withdrawn ]

Description:

National Control Instructions: Signals Passed at Danger

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

PURPOSE

The Network Rail Route Control is responsible for making sure that:

• each "Signal Passed at Danger" (SPAD) incident is responded to promptly

• the level of response required by the incident response matrix (as defined locally) is adhered to

• the incident is escalated to Senior Managers as required.


Edition : 3
File Size : 1 file , 34 KB
Number of Pages : 6
Published : 03/03/2012

History


Related products

NR NR/SP/ELP/27044 ISSUE 2
Published Date: 04/01/2006
Allocation of Designations for Switching Stations, Auxiliary Supply Points, Electrical Sections, Overhead Line Switches, Circuit Breakers and the Like, for a.c. Electrified Lines (aka NR/GN/ELP/27044)
$13.2
NR BRS-SM 2551
Published Date: 01/30/1995
Mechanical Backdrive Mounted in 4' on R.H.S. Full Depth CV Layout Point Machine Mounted on L.H.S.
$5.7
NR NR/L2/TRK/001/MOD11 ISSUE 11
Published Date: 03/05/2022
Inspection and Maintenance of Permanent Way: Track Geometry - Inspections and Minimum Actions
$18.6
NR RT/E/C/19257 ISSUE 1
Published Date: 08/01/1995
Signalling Equipment Workshop Engineering Notice (SIGWEN006) Smiths Industries Clamp Lock Power Pack (aka NR/GN/SIG/19257)
$7.5

Best-Selling Products

PCSA 4
Published Date: 05/01/1988
Mobile Power Crane and Excavator and Hydraulic Crane Standard