NR NR/L3/OCS/044/MS-07 ISSUE 7 PDF

NR NR/L3/OCS/044/MS-07 ISSUE 7 PDF

Name:
NR NR/L3/OCS/044/MS-07 ISSUE 7 PDF

Published Date:
06/06/2015

Status:
[ Withdrawn ]

Description:

Managed Station Manual - Control of Work on Managed Stations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This procedure details the process for allowing works to be carried out on Network Rail Managed Stations, from receiving an application for works, to signing off the work as complete and subsequent monitoring.

PURPOSE

This procedure provides a framework to allow the following:

  • all contractors to have their Risk Assessment / Method Statement (RAMS) or work package plan approved;
  • eliminate as much risk as possible from the planned works prior to persons arriving at site;
  • reduce the risk to an acceptable level when work is carried out on the station;
  • management of approved works on the station to completion.

Edition : 7
File Size : 1 file , 140 KB
Number of Pages : 14
Published : 06/06/2015

History


Related products

NR RT/ETE/2/3/6
Published Date: 03/17/1998
Fixing Details Site Drilled Deep and Shallow Depth Concrete Bearers Asc Conductor Rail
$5.7
NR NR/L3/TRK/002/G09 ISSUE 2
Published Date: 08/01/2007
S&C - Stone blowing - Hand Held
$5.7
NR NR/L2/ELP/CTM028/007 ISSUE 1
Published Date: 03/05/2022
Competence and Training in OLE Construction Engineering: OLEC 5B: Confirm the OLE Is Safe for Operational Purposes Between General OLE Construction Activities
$13.2
NR NR/CIV/SD/4560 ISSUE 2
Published Date: 03/05/2021
Frame Open Footbridge Series 4500: Full Structure Sections & Elevations Sheet 1
$5.7

Best-Selling Products