NR NR/L3/OHS/005 ISSUE 2 PDF

NR NR/L3/OHS/005 ISSUE 2 PDF

Name:
NR NR/L3/OHS/005 ISSUE 2 PDF

Published Date:
03/05/2022

Status:
[ Revised ]

Description:

Design and Construction Management in a High Street Environment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

The work instruction covers the end-to-end process and controls for managing works in a High Street Environment including:

a)  change control processes;

b)  supplier capability assurance;

c)  design and construction assurance;

d)  contracting strategies;

e)  competence requirements;

f)   monitoring;

g)  hand back.

It applies to the design and construction phases (including preparatory and hand back stages) of works undertaken in a High Street Environment where Network Rail is acting as the sole CDM client.  It does not apply to works taking place on the Network Rail Managed Infrastructure. It is not intended to apply to routine maintenance works.

NOTE: NR/L2/CIV/095 and NR/L1/CIV/094 or NR/L2CIV/096 apply where Network Rail is not the sole client – i.e. to third party and outside party works.

This work instruction applies to all those responsible for the design, delivery and assurance of requirements including Network Rail and the supply chain.

It does not include works which can create or transfer safety risk to or from Network Rail Managed Infrastructure or adversely affect its safe operation. Such works are L2/RSE/02009 plus all other relevant standards from the full suite of Netrowk Rail standards.

Purpose

This work instruction provides appropriate governance and assurance measures to mitigate risks during both the design and construction phases of works undertaken in a High Street Environment.  The risks mitigated include those which impact safety, environment, performance, financial and reputational.

The benefits are that it provides appropriate and risk-based processes for those works undertaken in a High Street Environment. This work instruction limits the application of railway derived controls  for high street works so that suppliers can apply best practice from the broader construction industry. It is expected that this will help drive better value for money and make Network Rail easier to work with for contractors who have not previously worked in the rail industry or have not previously worked directly for Network Rail.

This work instruction sets out requirements that will assist with achieving compliance to relevant UK legislation, statutory regulations and appropriate construction standards as recognized in Eurocodes and approved codes of practice.


Edition : 2
File Size : 1 file , 840 KB
Number of Pages : 26
Published : 03/05/2022

History

NR NR/L3/OHS/005 ISSUE 3
Published Date: 06/04/2022
Design and Construction Management in a High Street Environment
$18.6
NR NR/L3/OHS/005 ISSUE 2
Published Date: 03/05/2022
Design and Construction Management in a High Street Environment
$18.6
NR NR/L3/OHS/005 ISSUE 1
Published Date: 09/04/2021
Design and Construction Management in a High Street Environment
$18.6

Related products

NR NR/L3/OCS/044/FS-07Q1 ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Control of Work on Managed Stations - Hoarding Checklist
$5.7
NR NR/GN/OPS/005 ISSUE 2
Published Date: 06/06/2009
Control and Testing with Rolling Stock Using Special Operating Instructions
$13.2
NR NB 127 ISSUE 1
Published Date: 10/11/2013
ICME ECAB - Defective Signalling Cable
$5.7
NR TWI 2B003 ISSUE 1
Published Date: 03/01/2005
How to Prepare Trial Holes
$5.7

Best-Selling Products

ASHRAE/AMCA 51-1999 Addendum a-2001
Published Date: 2001
Addendum a-2001 to Standard 51-1999 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (AMCA Standard 210-99) (ANSI approved)
Free Download
ASHRAE/AMCA 51-1999
Published Date: 1999
Standard 51-1999 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (AMCA Standard 210-99) (ANSI approved)
$21.6
ASHRAE/AMCA 51-2007
Published Date: 2008
Standard 51-2007 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (ANSI/ASHRAE Approved) (ANSI/AMCA Standard 210-07)
$32.7