NR NR/L3/OHS/005 ISSUE 1 PDF

NR NR/L3/OHS/005 ISSUE 1 PDF

Name:
NR NR/L3/OHS/005 ISSUE 1 PDF

Published Date:
09/04/2021

Status:
[ Revised ]

Description:

Design and Construction Management in a High Street Environment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

The work instruction covers the end-to-end process and controls for managing works in a High Street Environment including:

a) change control processes;

b) supplier capability assurance;

c) design and construction assurance;

d) contracting strategies;

e) competence requirements;

f) monitoring;

g) hand back.

It applies to the design and construction phases (including preparatory and hand back stages) of works undertaken in a High Street Environment where Network Rail is acting as the sole CDM client. It does not apply to works taking place on the Network Rail Managed Infrastructure. It is not intended to apply to routine maintenance works.

NOTE: NR/L2/CIV/095 and NR/L1/CIV/094 or NR/L2CIV/096 apply where Network Rail is not the sole client – i.e. to third party and outside party works.

This work instruction applies to all those responsible for the design, delivery and assurance of requirements including Network Rail and the supply chain.

It does not include works which can create or transfer safety risk to or from Network Rail Managed Infrastructure or adversely affect its safe operation. Such works are covered by NR/L2/RSE/02009 plus all other relevant standards from the full suite of Network Rail standards.

Purpose

This work instruction provides appropriate governance and assurance measures to mitigate risks during both the design and construction phases of works undertaken in a High Street Environment. The risks mitigated include those which impact safety, environment, performance, financial and reputational.

The benefits are that it provides appropriate and risk-based processes for those works undertaken in a High Street Environment. This work instruction limits the application of railway derived controls for high street works so that suppliers can apply best practice from the broader construction industry. It is expected that this will help drive better value for money and make Network Rail easier to work with for contractors who have not previously worked in the rail industry or have not previously worked directly for Network Rail.

This work instruction sets out requirements that will assist with achieving compliance to relevant UK legislation, statutory regulations and appropriate construction standards as recognised in Eurocodes and approved codes of practice.


Edition : 1
File Size : 1 file , 640 KB
Number of Pages : 25
Published : 09/04/2021

History

NR NR/L3/OHS/005 ISSUE 3
Published Date: 06/04/2022
Design and Construction Management in a High Street Environment
$18.6
NR NR/L3/OHS/005 ISSUE 2
Published Date: 03/05/2022
Design and Construction Management in a High Street Environment
$18.6
NR NR/L3/OHS/005 ISSUE 1
Published Date: 09/04/2021
Design and Construction Management in a High Street Environment
$18.6

Related products

NR NR/L3/NDS/048/TMM004 ISSUE 2
Published Date: 06/01/2007
Train Operations Manual - Industry Mandatory Section: Train and Plant Movement and Control Arrangements within Engineering Possessions on Network Rail Managed Infrastructure
$5.7
NR TEF 3281 ISSUE 1
Published Date: 12/05/2020
Press Switch Adjustment Form
$5.7
NR SSI8003-65C ISSUE 7
Published Date: 09/05/2015
Swinging Overlaps - Chapter C: Examples 3 & 4
$18.6
NR NR/L2/SIG/11774/SRB0201RA ISSUE 2
Published Date: 06/03/2023
Network Rail Clamplock Plain Leads MK2 RCPL Installation SRB0201RA
$13.2

Best-Selling Products

1A1W1S1 Archive Product 105
Published Date: 01/01/2000
Welding Inspection Handbook
1A1W1S1 Archive Product 111
Published Date: 02/01/1981
Welding Technology for the Aerospace Industry
1A1W1S1 Archive Product 115
Published Date: 01/01/2002
Structural Welding Code - Steel
1A1W1S1 Archive Product 138
Published Date: 01/01/2002
Standard Welding Procedure Specification (Swps) for Gas Tungsten Arc Welding of Carbon Steel to Austenitic Stainless Steel (M-1, P-1 or S-1 to M-8, P-8, or S-8), 18 through 10 Gauge, in the As-Welded Condition, with or without Backing
1A1W1S1 Archive Product 142
Published Date: 01/01/2001
Ventilation Guide for Weld Fume
1A1W1S1 Archive Product 167
Published Date: 08/01/2008
Structural Welding Code Steel Bundled Set A