NR NR/L3/OPS/021/13 ISSUE 1 PDF

NR NR/L3/OPS/021/13 ISSUE 1 PDF

Name:
NR NR/L3/OPS/021/13 ISSUE 1 PDF

Published Date:
12/07/2019

Status:
[ Active ]

Description:

Weather Management Index: Extreme Weather Response Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
CONTAINS NR/BS/LI/482

This module applies to all members of the EWAT including train and freight operators.

 

Purpose

The Extreme Weather Response Process, detailed in NR/L2/OPS/021 Weather – Managing the Operational Risks, includes the Extreme Weather Action Teleconference (EWAT). This module outlines the timetable, agenda items and notes taken for an Extreme Weather Action Teleconference (EWAT). This module provides

additional guidance on the content and timing of these conferences.


Edition : 1
File Size : 1 file , 670 KB
Number of Pages : 28
Published : 12/07/2019

History


Related products

NR RT/ETE/7/2/1
Published Date: 03/17/1998
Details of Conductor Rail End Ramp Arc Shield
$5.7
NR NR/L2/TRK/9020 ISSUE 2
Published Date: 03/07/2020
Structural Expansion Joints - Design, Installation and Maintenance
$13.2
NR NR/L3/CIV/040 ISSUE 3
Published Date: 06/03/2023
Work Instruction for the Use of Protective Coating Systems
$24.3
NR NR/L2/ELP/27314/03 ISSUE 1
Published Date: 09/07/2019
Construction Assurance for Overhead Contact Systems: Testing and Commissioning
$7.5

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants