NR NR/L3/OPS/045/1.06 ISSUE 1 PDF

NR NR/L3/OPS/045/1.06 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/1.06 ISSUE 1 PDF

Published Date:
10/03/2020

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 1.06: National Operations Quality Assurance Review (Assistance for Regions)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-ops-045-1-06-issue-1_2764641

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

The requirements of this procedure apply to the OP&S team and all signalling operational manager disciplines that have a compliance responsibility for signallers and mobile operations managers.

PURPOSE

The purpose of this document is to provide a framework for the Operations, Principles and Standards (OP&S) team to deliver when carrying out a National Operations Quality Assurance Review (NOQAR).

The NOQAR is a support mechanism for each region to determine the level of compliance to  NR/L3/OPS/045 and other operational group standards. By reviewing the level of compliance, improvements can be suggested by the OP&S team which may assist the regions in reaching a full  compliance and mitigating all possible risks while maintaining continuous improvement.

The regions are at risk of non-compliance which presents but not limited to, safety, performance  and financial risk to the business. While these non-compliances may later be identified by the National Audit team, the NOQAR acts both as a ‘health check’ to determine the current compliance state of each as well as promoting best practice nationally.


Edition : 1
File Size : 1 file , 500 KB
Number of Pages : 10
Published : 10/03/2020

History


Related products

NR NR/L2/SIGELP/50000/MODA ISSUE 2
Published Date: 09/04/2021
Inspection and Maintenance Periodicities (Including Risk Based Maintenance Criteria) for Signalling Power Distribution Equipment above 175 Volts
7.50 €
NR RT/D/S/003 ISSUE 1
Published Date: 05/01/1995
Content of Railtrack Contractor's Safety Case
13.20 €
NR BRS-SM 850/1 ISSUE A
Published Date: 01/28/1987
Apparatus Case Large Stile - Top
5.70 €
NR NR/L3/ELP/27406/MOD F ISSUE 1
Published Date: 12/03/2011
Engineering Deliverable Requirements for Electrical Power Asset Design Module F: Points Heating
7.50 €

Best-Selling Products