NR NR/L3/OPS/045/2.08 ISSUE 1 PDF

NR NR/L3/OPS/045/2.08 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/2.08 ISSUE 1 PDF

Published Date:
12/07/2019

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 2.08: Competency Framework to Carry Out the Role of Level Crossing Keeper

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The requirements of this procedure apply to any person competent to carry out the role of a level crossing keeper and those involved in the management of these individuals. This procedure applies to the following level crossings (depending on types of crossings worked):

• Automatic Half Barrier Crossing (AHBC)

• Automatic Barrier Crossing Locally monitored (ABCL)

• Automatic Open Crossing Locally monitored (AOCL)

• Obstacle Detector (OD)

• Close Circuit TV (CCTV)

• Remote Controlled Crossing with Barriers (RC)

PURPOSE

This procedure allows Network Rail to confirm that those who operate level crossings are competent to do so.


Edition : 1
File Size : 1 file , 370 KB
Number of Pages : 18
Published : 12/07/2019

History


Related products

NR NR/SP/STP/090 ISSUE 1
Published Date: 06/01/2005
Managing Change to Network Rail Standards (aka NR/CS/STP/090)
$24.3
NR NR/L3/OPS/045/4.08 ISSUE 2
Published Date: 01/06/2024
National Operating Procedure (NOP) 4.08: Reporting of Dangerous Goods Incidents
$5.7
NR E10000/14/5 ISSUE C
Published Date: 03/06/1980
Reed Remote Control System - Frequency Range
$5.7
NR BRS-SM 15 ISSUE B
Published Date: 07/31/1972
Balance Lever 1 Way
$5.7

Best-Selling Products