Name:
NR NR/L3/OPS/045/2.08 ISSUE 1 PDF
Published Date:
12/07/2019
Status:
[ Active ]
Publisher:
Network Rail
The requirements of this procedure apply to any person competent to carry out the role of a level crossing keeper and those involved in the management of these individuals. This procedure applies to the following level crossings (depending on types of crossings worked):
• Automatic Half Barrier Crossing (AHBC)
• Automatic Barrier Crossing Locally monitored (ABCL)
• Automatic Open Crossing Locally monitored (AOCL)
• Obstacle Detector (OD)
• Close Circuit TV (CCTV)
• Remote Controlled Crossing with Barriers (RC)
PURPOSE
This procedure allows Network Rail to confirm that those who operate level crossings are competent to do so.
| Edition : | 1 |
| File Size : | 1 file , 370 KB |
| Number of Pages : | 18 |
| Published : | 12/07/2019 |