Name:
NR NR/L3/OPS/045/2.12 ISSUE 1 PDF
Published Date:
09/02/2017
Status:
[ Revised ]
Publisher:
Network Rail
This procedure applies to the briefing of all operations employees who are briefed within a designated cycle rather than by the management briefing cascade process. It applies to all:
a) Signallers;
b) Crossing Keepers;
c) Movable / Swing Bridge Operators;
d) Mobile Operations Managers;
e) Route Operations Controllers;
f) Electrical Control Operators; and
g) other front line Operational Managers and operations employees who are briefed within the designated cycle
PURPOSE
This procedure provides a systematic and structured approach to the briefing and discussion of safety issues for all identified staff.
| Edition : | 1 |
| File Size : | 1 file , 230 KB |
| Number of Pages : | 4 |
| Published : | 09/02/2017 |